WAC 173-173-140
What are the installation requirements for
open channel measuring systems? The measuring facility shall be
installed or constructed in accordance with the manufacturer's
and/or designer's specifications.
[Statutory Authority: RCW 90.03.360, 90.44.050, [90.44.]250,[90.44.]450
and chapter 43.21A RCW. 02-02-017 (Order 00-01), §
173-173-140, filed 12/21/01, effective 1/21/02.]