WAC 173-170-070
Criteria for approval of requests for
financial assistance -- Implementation phase. (1) The
implementation phase project(s) must be included in a
comprehensive water conservation plan approved by the
department.
(2) The agricultural water supply facilities must be
designed to accomplish the purpose of the planned project. Accepted engineering design principles, criteria, and concepts
will be used in the design of the facilities and approved by
the department. Cost estimates for the proposed project must
be prepared in detail. Plans and specifications must be
approved by the department prior to advertising for
construction bids.
(3) The State Environmental Policy Act (SEPA)
requirements for any proposed actions must be met. The SEPA
rules, chapter 197-11 WAC, will be followed to determine the
environmental impacts of the proposed project. A copy of the
final SEPA document and any needed supporting environmental
analysis must be submitted to the department.
(4) Documentation showing all lands and land rights
required for satisfactory construction, operation, and
maintenance of the project have been or can be acquired.
(5) The project will not be in conflict with any
applicable federal, state, and local laws, orders,
regulations, rules, licenses, and permits.
[Statutory Authority: Chapter 43.99E RCW, Referendum 38, and
RCW 90.54.040. 03-07-104 (Order 02-11), § 173-170-070, filed
3/19/03, effective 4/19/03. Statutory Authority: RCW 43.17.060. 90-20-109, § 173-170-070, filed 10/2/90, effective
11/2/90.]