WAC 173-160-141
What are the requirements regarding
water well reports? (1) Anyone who constructs or
decommissions a well is required to submit a complete report
on the construction or decommissioning of the well to the
water resources program within thirty days after completion of
a well, or after the drilling equipment has left the site. The report must be an accurate summation of the data collected
in the field taken from field notes written as the well was
constructed or decommissioned. Field notes must be available
at all times during construction or decommissioning for review
by state and local inspectors and kept until the well report
is submitted. Submission of a well report to consulting firms
does not meet the well contractor's obligation under this
section.
(a) This applies to all water wells.
(b) The water well report must be made on a form provided
by the department, or a reasonable facsimile of the form, as
approved by the department.
(2) Where applicable the water well report must include,
at least, the following information:
(a) Owner name; operator/trainee name; operator/trainee
license number; contractor registration number, drilling
company name;
(b) Tax parcel number;
(c) Well location address;
(d) Location of the well to at least 1/4, 1/4 section or
smallest legal subdivision;
(e) Unique well identification tag number;
(f) Construction or decommissioning date;
(g) Start notification number;
(h) Intended use of well;
(i) The well depth, diameter, and general specifications
of each well;
(j) Total depth of casing;
(k) Well head elevation;
(l) Drilling method;
(m) Seal material, seal location and type of placement
used;
(n) Filter pack location; filter pack material used;
(o) The thickness and character of each bed, stratum or
formation penetrated by each well, including identification of
each water bearing zone;
(p) Casing gauge, diameter, stickup, type of material,
and length, also of each screened interval or perforated zone
in the casing;
(q) The tested capacity of each well in gallons per
minute, and the test duration and draw down of the water level
at the end of the capacity test;
(r) Recovery data;
(s) For each nonflowing well, the depth to the static
water level, as measured below the land surface;
(t) For each flowing well, the shut-in pressure measured
above the land surface, or in pounds per square inch at the
land surface; and
(u) Water right permit or certificate number for all
wells that are not exempt under RCW 90.44.050; and
(v) Such additional factual information as may be
required by the department.
(3) The well report must include one of the following:
(a) The license number and signature of the person who
constructed or decommissioned the well.
(b) The license number and signature of the trainee and
the licensed operator under chapter 18.104 RCW.
(c) The license number and signature of the exempted
individual as defined under RCW 18.104.180(3).
(d) The signature of the individual exempted under RCW 18.104.180(1).
(4) If a well report is missing, a new report may be
generated. This report shall contain all physical components
of the well and report all available information in accordance
with this section. The report shall be signed by the
individual collecting the physical information of the well.
Submittal of this report does not relieve the person who
constructed the well of their obligation to submit a complete
well report under subsection (1) of this section.
(5) This rule shall allow an individual to submit
electronic reports in accordance with department procedures.
The use of a digital signature in the electronic report will
be authorized as a substitute for an original signature under
subsection (3) of this section.
[Statutory Authority: Chapter 18.104 RCW. 09-01-125 (Order
08-10), § 173-160-141, filed 12/19/08, effective 1/19/09;
06-23-121 (Order 06-08), § 173-160-141, filed 11/21/06,
effective 12/22/06. Statutory Authority: Chapter 18.104 RCW
and RCW 43.21A.080. 98-08-032 (Order 97-08), § 173-160-141,
filed 3/23/98, effective 4/23/98.]