WAC 136-163-040
Limitations and conditions -- Emergent
projects. To be eligible for emergent project approval, the
project shall be evaluated by the county road administration
board grant programs engineer, with the participation of the
county engineer, on the same point system as all other projects
within the region. The proposed emergent project must rank at or
above the regional funding cut off line on the current regional
array based upon one hundred percent of the current estimated
regional allocation as determined by the county road
administration board.
[Statutory Authority: Chapter 36.79 RCW. 99-01-021, §
136-163-040, filed 12/7/98, effective 1/7/99. Statutory
Authority: RCW 36.79.060. 96-17-014, § 136-163-040, filed
8/12/96, effective 9/12/96.]