WAC 136-161-040
RAP program cycle -- Field review by county
road administration board. After all preliminary prospectuses
are received, the county road administration board will schedule
and conduct an on-site field review of each project. During the
field review, conducted jointly with the county engineer or
his/her designee (unless waived by the county engineer), the
assigned county road administration board staff person will
review the overall project scope with the county representative
and, using that region's priority rating process, determine the
rating score of all priority elements which are based on a visual
examination. To ensure both uniformity and professional judgment
in the visual ratings, the assigned county road administration
board staff person shall be a licensed professional civil
engineer in the state of Washington, and the same person shall
review and rate all projects within a region. All field reviews
will be completed, and the visual rating scores returned to each
submitting county, by July 1st of each even-numbered year prior
to a funding period.
[Statutory Authority: Chapter 36.79 RCW. 01-05-009, §
136-161-040, filed 2/8/01, effective 3/11/01; 99-01-021, §
136-161-040, filed 12/7/98, effective 1/7/99. Statutory
Authority: RCW 36.79.060. 94-16-111, § 136-161-040, filed
8/2/94, effective 9/2/94.]