WAC 136-16-020
Contents of annual program. The adopted
annual program shall include, but not be limited to:
(1) A line item for estimated preliminary engineering
costs;
(2) A line item for estimated right of way acquisition
costs; and
(3) A listing of all proposed construction projects for
the year including a brief description of the work, the name,
number and functional classification of the road, an estimate
of the total cost of each project, including construction
engineering but excluding preliminary engineering and right of
way acquisition, and a notation as to whether construction
work on each project is to be done by contract or construction by county forces or both.
When a project involves both contract and construction by county forces work the estimate shall be
divided to show the estimated cost of each type of work. The
sum of all construction costs shall be approximately equal to
the amount included in the road fund construction budget for
construction work. All construction projects shall be shown,
regardless of funding source, including all projects
previously authorized and under way on which expenditures are
anticipated during the program year. Projects previously
authorized on which construction work is contemplated within
the program year shall also be listed showing the estimated
costs of work during the program year. In all cases, the
total amount of proposed construction by county
forces costs shall not exceed the construction
by county forces limit as computed in WAC 136-16-022.
[Statutory Authority: Chapter 36.78 RCW. 09-23-044, §
136-16-020, filed 11/9/09, effective 12/10/09. Statutory
Authority: RCW 36.78.070 and 36.79.060. 96-17-013, §
136-16-020, filed 8/12/96, effective 9/12/96. Statutory
Authority: Chapter 36.78 RCW. 80-09-084 (Order 38), §
136-16-020, filed 7/22/80; Order 29, § 136-16-020, filed
8/3/76; Order 21, § 136-16-020, filed 4/19/73; Regulation 2, §
136-16-020, filed 12/13/67.]