WAC 132N-150-210   Temporary structures.  The erection of tents, awnings, canopies, or similar structures must be cleared with the security/safety office.



[Statutory Authority: RCW 28B.50.140. 02-04-068, § 132N-150-210, filed 1/31/02, effective 3/3/02.]