WAC 16-302-530
Land requirements for white clover and
trefoil seed certification. Land requirements for the production
of white clover and trefoil seed are as follows:
(1) Breeder seed for the production of white clover or
trefoil foundation seed must not be planted on land on which the
same kind has been previously planted. During the year prior to
white clover or trefoil seeding, the land must be in a cultivated
crop or fallow and the land must be free from volunteer plants as
determined by a field inspection during the season in which the
seedling is established.
(2) Foundation seed for the production of registered or
certified white clover or trefoil seed must be planted on land on
which no other variety or strain of the same kind is grown or
planted during the season in which the seedling is established.
(3) Foundation or registered trefoil seed for the production
of certified seed shall be planted on land on which no other
variety or strain of trefoil is grown or planted during the three
years prior to planting.
(4) Reseeding of a white clover or trefoil seed field due to
failure or partial failure of the first seeding may be done by
referring to the guidelines in WAC 16-302-045(5).
(5) Certification of trefoil shall be limited to stands not
exceeding five years of age, except for a variety grown outside
its region of adaptation, in which case certification shall be
limited to stands not exceeding three years of age.
(6) Foundation or certified producing white clover fields
are eligible for certification for only two harvest years
following the year of seeding if the seed production the first
year is prevented. Foundation fields may be reclassified to the
next lower class after being harvested for seed for two years.
(7) Ditchbanks, roadways, etc., adjacent to a certified
white clover or trefoil field must be free of volunteer plants of
the same kind and prohibited noxious weeds.
(8) Volunteer plants in the white clover or trefoil field
may be cause for rejection or reclassification of the seed field.
(9) No manure or other contaminating materials may be
applied during the establishment and production period of the
white clover or trefoil stand.
[Statutory Authority: RCW 15.49.005, 15.49.081, 15.49.310,
15.49.370(3) and chapter 17.24 RCW. 00-24-077, § 16-302-530,
filed 12/4/00, effective 1/4/01.]