WAC 16-302-265
Seed field inspection requirements for bean
seed certification. Seed field inspection requirements for the
production of bean seed are as follows:
(1) When factors affecting certification are most evident.
The second inspection, when required, shall be a windrow
inspection.
(2) A serology or a grow out test to verify presence of
seed-borne diseases in beans may be required if the applicant, or
the certifying agency deems it necessary as allowed under WAC 16-301-480(1).
[Statutory Authority: RCW 15.49.005, 15.49.081, 15.49.310,
15.49.370(3) and chapter 17.24 RCW. 00-24-077, § 16-302-265,
filed 12/4/00, effective 1/4/01.]