WAC 16-302-085
When may an applicant withdraw a field from
inspection for seed certification? The applicant applying for
seed certification may withdraw a field from field inspection for
seed certification by notifying the certifying agency before the
field is inspected.
[Statutory Authority: RCW 15.49.005, 15.49.081, 15.49.310,
15.49.370(3) and chapter 17.24 RCW. 00-24-077, § 16-302-085,
filed 12/4/00, effective 1/4/01.]