WAC 16-201-028
Secondary containment of liquid bulk
fertilizers -- Walls and floors. (1) The secondary containment
floor shall slope to one or more liquid tight collection points
or sumps that allows spilled or deposited materials to be easily
removed.
(2) The walls and floor of secondary containment shall be
constructed of steel, poured reinforced concrete, precast
concrete modules, solid masonry, or other materials or
combination of materials that:
(a) Shall be designed to withstand a full hydrostatic head
of any discharged liquid;
(b) Shall have sufficient thickness and chemical resistance
to contain a release until it is recovered;
(c) Shall be constructed and maintained to a permeability
standard of 1X10-6 cm/sec as determined by ASTM test method D-5084
Measurement of Hydraulic Conductivity of Saturated Porous
Materials Using a Flexible Wall Permeameter or other test method
approved by the department;
(d) Shall have sufficient structural strength to maintain
the containment's integrity under normally anticipated loadings;
(e) Shall be chemically compatible with the materials being
stored; and
(f) Shall be properly sealed to prevent leakage.
(3) Any piping through the outside walls of secondary
containment shall be installed and maintained such that the
structural integrity of the wall is preserved and in such a
manner as to prevent leaks.
[Statutory Authority: RCW 15.54.800. 00-23-075, § 16-201-028,
filed 11/17/00, effective 12/18/00. Statutory Authority: RCW 15.54.800 and 15.58.040. 93-22-093 (Order 5018), § 16-201-028,
filed 11/2/93, effective 3/1/94.]