WAC 463-60-155
Proposal -- Energy transmission systems. The application shall identify the federal, state, and
industry criteria used in the conceptual design, route
selection, and construction for all facilities identified in
RCW 80.50.020 (6) and (7), and shall indicate how such
criteria are met.
[Statutory Authority: RCW 80.50.040 (1) and (12). 04-21-013,
amended and recodified as § 463-60-155, filed 10/11/04,
effective 11/11/04. Statutory Authority: RCW 80.50.040(1). 83-01-128 (Order 82-6), § 463-42-155, filed 12/22/82. Statutory Authority: RCW 80.50.040(1) and chapter 80.50 RCW. 81-21-006 (Order 81-5), § 463-42-155, filed 10/8/81. Formerly
WAC 463-42-240.]