WAC 383-07-085
Application format -- For applications submitted
after the project period. For applications to be considered by the
board for teams that have already implemented their project
improvements, teams interested in receiving a TIP award must meet
these eligibility criteria:
(1) The report shall be submitted to the productivity board
within one year of full implementation of the team's project.
(2) The report must be submitted to the productivity board by
the agency with the agency head's approval. The agency head's
approval shall be required for the team to be eligible for a TIP
award.
(3) An identification of the baseline, against which savings
were evaluated at the end of the project period. Teams shall
demonstrate to the satisfaction of the board that the team operated
at a lower cost or with an increase in revenue with no decrease in
the level of services rendered.
(4) The report must also include the following:
(a) A general description of the team and its mission and when
the team project was implemented;
(b) Performance measures which quantify the workflow and
outcome measures of the team;
(c) The actual net savings and/or revenue derived from the
team project and calculations showing how the figures were derived;
(d) Fiscal information pertinent to outcomes;
(e) A list of participating personnel and their Social
Security numbers to be used for payment purposes, with special
notation of those working less than full time; and
(f) Signatures of agency management authorizing the team's
participation in the TIP project, including:
(i) The head of the agency in which the team is located or his
or her designee. The agency head may choose to waive the
requirement of having other authorizing agency signatures
referenced in (f)(ii) through (iv) of this subsection;
(ii) The supervisor/manager of the participating team;
(iii) The appropriate fiscal/budget officer of the agency; and
(iv) Other signatures specified by the agency, such as the
personnel manager and division directors.
(5) The report includes final report information, and
therefore, shall serve as the only report needed to receive a TIP
award. The board shall make the final determination whether to
approve the TIP award based on the information provided in the
report.
[Statutory Authority: Chapter 41.60 RCW. 99-24-092, § 383-07-085,
filed 11/30/99, effective 1/1/00.]