WAC 296-150F-0230   What are the insignia application requirements?  (1) If you are requesting insignia for units that you intend to manufacture under a new design plan, your completed application must include:

     (a) A completed design plan approval request form;

     (b) One complete set of design plans, specifications, engineering analysis, test procedures and results, plus one additional set for each manufacturing location where the design plan will be used;

     (c) At least one set of design plans must have an original wet stamp from a professional engineer or architect licensed in Washington state. We will retain the set with the original wet stamp; and

     (d) A one-time initial filing fee, the design plan fee (if we approve your design plan) and the fee for each insignia. (See WAC 296-150F-3000.)

     (2) If you are requesting insignia under an approved design plan, your completed application must include:

     (a) A completed application for insignia form; and

     (b) The fee for each insignia requested. (See WAC 296-150F-3000.)



[Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. 96-21-146, § 296-150F-0230, filed 10/23/96, effective 11/25/96.]