WAC 296-127-01358
Pile drivers. For the purpose of the
Washington state public works law, chapter 39.12 RCW, the work of
a pile driver includes, but is not limited to:
Pile driver (pile buck).
• The preparation, aligning, plumbing, setting, stressing,
testing, pulling, welding, cutting off and capping of piling of
any type including steel pile and concrete pile and the splicing,
barking, heading and shoeing of piling and the rigging and
signaling connected with all of the above.
• Operating engineer pile driver.
• Operating any power equipment used for pile driving, such
as cranes equipped with drophammers and drums and hoists on
A-frame type fixed leads on floating rigs.
[Statutory Authority: Chapter 39.12 RCW, RCW 43.22.270 and 43.22.051. 00-15-077, § 296-127-01358, filed 7/19/00, effective
7/19/00.]