WAC 222-16-036
*Wetland mapping. Wetlands mapping is
required in connection with any forest practices application
where the proposed activities relate to timber harvest or road
construction.
*(1) Landowners must map all forested wetlands and Type A
and B Wetlands where more than one-tenth (0.1) acre of such
wetlands will be impacted by filling and where mitigation for
such filling is required.
*(2) Landowners must make an approximate determination of
the boundaries and map all forested wetlands (regardless of
size) that are in a riparian management zone, including those
parts of the forested wetlands that lie within the harvest
unit but outside of the riparian management zone. Mapping is
not required if entry within the riparian management zone is
not proposed as part of the harvest application.
*(3) Landowners must make an approximate determination of
the boundaries and map all forested wetlands 3 acres or more
in size within the boundaries of the land to be covered by the
application.
*(4) All such mapping must be performed to the wetland
delineation and mapping standards outlined in the board
manual, section 8.
[Statutory Authority: Chapter 34.05 RCW, RCW 76.09.040,[76.09.]050
, [76.09.]370, 76.13.120(9). 01-12-042, §
222-16-036, filed 5/30/01, effective 7/1/01.]