Chapter 173-240 WAC
SUBMISSION OF PLANS AND REPORTS FOR CONSTRUCTION OF WASTEWATER FACILITIES
Last Update: 7/11/00

WAC SECTIONS

173-240-010 Purpose and scope.
173-240-020 Definitions.
DOMESTIC WASTEWATER FACILITIES
173-240-030 Submission of plans and reports.
173-240-035 Restrictions -- Subsurface disposal systems.
173-240-040 Review standards.
173-240-050 General sewer plan.
173-240-060 Engineering report.
173-240-070 Plans and specifications.
173-240-075 Construction quality assurance plan.
173-240-080 Operation and maintenance manual.
173-240-090 Declaration of construction completion.
173-240-095 Form -- Declaration of construction of water pollution control facilities.
173-240-100 Requirement for certified operator.
173-240-104 Ownership and operation and maintenance.
INDUSTRIAL WASTEWATER FACILITIES
173-240-110 Submission of plans and reports.
173-240-120 Review standards.
173-240-130 Engineering report.
173-240-140 Plans and specifications.
173-240-150 Operation and maintenance manual.
DOMESTIC AND INDUSTRIAL WASTEWATER FACILITIES
173-240-160 Requirement for professional engineer.
173-240-170 Right of inspection.
173-240-180 Approval of construction changes.
DISPOSITIONS OF SECTIONS FORMERLY CODIFIED IN THIS CHAPTER
173-240-105 Form -- Certificate of construction of water pollution control facilities. [Statutory Authority: RCW 90.48.110. 79-02-033 (Order DE 78-10), § 173-240-105, filed 1/23/79. Formerly chapter 372-20 WAC.]  Repealed by 83-23-063 (Order DE 83-30), filed 11/16/83.  Statutory Authority: Chapters 43.21A and 90.48 RCW.