WAC 173-184-105
Equivalent compliance plan. (1) Any
owner or operator may submit a proposal for equivalent
compliance for the alternative measures required in WAC 173-184-115 and 173-184-120. Any owner or operator who
submits a proposal must preboom or meet the alternative
measures until the equivalent compliance plan is approved.
(a) Rate A (see WAC 173-184-110) deliverers may only
submit an equivalent compliance plan proposal for alternative
measures found in WAC 173-184-115(7).
(b) Rate B deliverers may only submit an equivalent
compliance plan proposal for alternative measures found in WAC 173-184-120(2).
(2) The proposal must contain the following and in the
order presented:
(a) Cover sheet with name of company seeking equivalent
compliance and point of contact information;
(b) Table of contents including supporting documents and
appendices;
(c) Executive summary of the equivalent proposal;
(d) A detailed description of the equivalent proposal
that includes, when appropriate, the equipment, personnel,
operating procedures, and maintenance systems and any other
alternatives that are being proposed;
(e) A detailed analysis of how the proposal offers
equivalent or greater level of protection as compared to the
requirements in this chapter. This includes:
(i) Methodology of the analysis;
(ii) Detailed results with supporting data, references,
graphs, tables, pictures, and other relevant information; and
(iii) Technical feasibility of proposal versus current
requirements.
(3) Submission timeline of proposed equivalent compliance
plan. The owner or operator must submit the equivalent
compliance proposal to ecology at least one hundred twenty
calendar days before planned operation under this section.
(a) Ecology will make the proposal available for a
thirty-calendar-day public review and comment period;
(b) Ecology may request additional information regarding
any aspect of the proposal such as site-specific
meteorological, water current velocity, and other monitoring
data to support the proposal;
(c) Ecology will respond to the owner or operator within
ninety calendar days of receipt of the proposal with a letter
approving, conditionally approving, or disapproving the
proposal; and
(d) The approval will be valid for no more than five
years from the date on the approval letter.
(4) Approval of proposed equivalent compliance plan.
Ecology may approve the equivalent compliance proposal if,
based upon the documents submitted and other information
available to the agency, it finds that:
(a) The equivalent compliance proposal is complete and
accurate; and
(b) The equivalent compliance proposal would provide an
equivalent or greater level of environmental protection as the
alternative measures required in WAC 173-184-115 and 173-184-120.
(5) Ecology may reconsider an approval, or conditional
approval, at any time after a response to a significant oil
spill by the company.
(6) The owner or operator must submit one paper copy and
one electronic copy of the proposal to ecology:
The Department of Ecology
Spill Prevention, Preparedness, and Response Program
Equivalent Compliance Review
P.O. Box 47600
Olympia, WA 98504-7600
Or
The Department of Ecology
Spill Prevention, Preparedness, and Response Program
Equivalent Compliance Review
300 Desmond Drive
Lacey, WA 98503
[Statutory Authority: RCW 88.46.160, 88.46.165, and chapter 90.56 RCW. 06-20-034 (Order 06-02), § 173-184-105, filed
9/25/06, effective 10/26/06.]