WAC 173-145-060
FCAAP project application process. The
project application process for the eligible municipal
corporations' applications includes the following in the general
sequence given.
(1) The applicant shall prepare the project application to
comply with the provisions of chapter 86.26 RCW and this chapter.
The application must be made on a form furnished by ecology. A
complete application shall include the following:
(a) A written description of the project containing the
following as a minimum: Name of applicant, name of affected
water body, project summary, location, amount of local match, and
proposed local funding source;
(b) A detailed cost estimate identifying major project
elements;
(c) A map to identify water body names, stream river mile,
section-township-range;
(d) Construction plans; and
(e) A description of the project benefits that describes how
the project will mitigate flood damages and describes development
which exists on adjacent and nearby lands which are protected by
the facility.
(2) The applicant shall review the preliminary project
proposal with the county engineer, the Washington department of
fish and wildlife and the department of natural resources and any
affected Indian tribes.
(3) The applicant shall submit a prioritized list of project
applications to the county engineer.
(4) The county engineer shall submit a prioritized list of
all project applications within the county to ecology.
(5) The county engineer shall furnish evidence to ecology
that the comprehensive flood control management plan described in
WAC 173-145-040 is being prepared or is completed and adopted by
the appropriate local authority and the flood plain management
activities described in WAC 173-145-050 are being implemented.
[Statutory Authority: RCW 86.26.105. 01-02-006 (Order 00-13), §
173-145-060, filed 12/21/00, effective 1/21/01. Statutory
Authority: Chapter 86.26 RCW. 87-04-022 (Order 86-36), §
173-145-060, filed 1/28/87; 85-14-002 (Order DE 85-10), §
173-145-060, filed 6/21/85.]