WAC 136-165-020
Requirements for consideration of RATA
fund increases. (1) When a county submits its final
prospectus as described in WAC 136-161-050, the county road
administration board presumes that the amount of RATA funds
requested, plus any non-RATA funds that may be designated for
the project, are sufficient to fully, and in a timely manner,
complete the project as described.
(2) In extraordinary circumstances, a county may request
an increase in the amount of RATA funds allocated to a
project. A county may request an increase in a project's RATA
allocation only twice in the course of a project's
development: At the completion of preliminary engineering,
and prior to commencing construction. A project shall be
considered to have commenced construction if:
(a) The construction contract for the work has been
awarded; and
(b) If done by county forces, the work has commenced,
except for labor construction engineering.
All cost increases during the course of construction
shall be the responsibility of the county. Requests for
increases in excess of fifty percent of the original RATA
allocation will not be considered or granted; the county must
secure other funds, withdraw or request the termination of the
project, or request a change in scope and/or project limits.
(3) A request by a county for an increase in RATA funds
allocated to a project shall demonstrate that:
(a) The county at the time of preparing its final project
prospectus considered the factors listed in subsection (4) of
this section;
(b) The request for an increased allocation is based on
extraordinary and unforeseeable circumstances of the type
listed in subsection (5) of this section;
(c) It is not feasible to reduce the scope and/or project
limits so the project can be substantially constructed within
the initial RATA allocation;
(d) The request is not to pay for an expansion of the
originally approved project;
(e) If the work is to be done by contract, the county has
supplied to the CRABoard, an updated engineer's cost estimate
prior to, and within three months of, advertisement of the
project for construction bids; and
(f) If the work is to be done by county forces, the
county has supplied to the CRABoard, an updated engineer's
cost estimate prior to, and within three months of,
commencement of the work.
(4) At the time of preparation and submittal of the final
project prospectus, a county is expected to consider all
information which may affect the cost of the project. In
cases where the information is incomplete or poorly defined,
the county is to exercise good professional judgment and/or
seek outside professional assistance and advice in order to
prepare a reasonable RATA fund request. The information which
a county is expected to consider includes, but is not limited
to, the following:
(a) The availability at the needed time of matching funds
and other supplementary funds;
(b) All technical data reasonably available such as
topographic maps, reconnaissance reports, surface and
subsurface geotechnical data, hydraulic and hydrological data,
sources of materials, applicable design standards, and any
earlier preliminary engineering;
(c) Required permits, including preproject scoping
consultations with the permitting agencies and an estimate of
the costs of complying with permit requirements;
(d) Required right of way or other easements, and the
time and cost of acquisition;
(e) Availability of qualified contractors to perform the
work;
(f) Ownership, type, amount, and time requirements of any
required utility relocation;
(g) Historical and projected labor, equipment and
material costs; and
(h) The project development timetable leading to
completed construction and the interrelation of this project
to all other work activities under the control of the county
engineer.
(5) The county road administration board will increase
RATA funds allocated to a project only if it finds that the
request for an increased allocation is based on extraordinary
and unforeseeable circumstances, including but not limited to
the following:
(a) The county relied on existing technical data which
were later found to be in error, and which will necessitate a
significant design change prior to proceeding with
construction;
(b) Project permit requirements were substantially
changed, or new permits were required;
(c) Supplementary funds, such as impact fees, developer
contributions, grants, etc., which were forecasted to be
available for the project, were withdrawn or otherwise became
unavailable;
(d) Design or other standards applicable to the project
were changed; and/or
(e) The start of construction will be significantly
delayed or additional construction requirements will be added
as a direct result of legal action; provided however, that the
failure of a county to exercise its statutory powers, such as
condemnation, will not be grounds for increasing RATA funds.
[Statutory Authority: Chapter 36.78 RCW. 09-23-044, §
136-165-020, filed 11/9/09, effective 12/10/09. Statutory
Authority: Chapter 36.79 RCW. 06-11-067, § 136-165-020,
filed 5/12/06, effective 6/12/06; 99-01-021, § 136-165-020,
filed 12/7/98, effective 1/7/99. Statutory Authority: RCW 36.79.060. 94-16-109, § 136-165-020, filed 8/2/94, effective
9/2/94.]