WAC 136-161-050
RAP program cycle -- Final prospectus. By
September 1st of each even-numbered year prior to a funding
period, each eligible county shall submit a final prospectus for
each project for which it seeks RATA funds. Each final
prospectus shall be submitted on forms provided by the county
road administration board and shall include a vicinity map, a
typical cross-section (existing and proposed), and, if a design
deviation is required, an evaluation and determination by the
county engineer. If a project is for the improvement of a road
which continues into an adjacent county and the project terminus
is within one thousand feet of the county line, the prospectus
shall include a statement signed by the county engineer of the
adjacent county certifying that the adjacent county will
cooperate with the applicant county to the extent necessary to
achieve a mutually acceptable design. All final prospectuses
shall indicate that the construction of the project shall begin
not later than six years from the date of project approval by the
county road administration board. All final prospectuses shall
come from the pool of preliminary prospectuses submitted and
field reviewed as specified in WAC 136-161-030 and 136-161-040.
[Statutory Authority: Chapter 36.79 RCW. 01-05-009, §
136-161-050, filed 2/8/01, effective 3/11/01; 99-01-021, §
136-161-050, filed 12/7/98, effective 1/7/99. Statutory
Authority: RCW 36.79.060. 94-16-111, § 136-161-050, filed
8/2/94, effective 9/2/94.]