WAC 98-14-080
Development plan for unconstructed,
undeveloped property. Any cemetery authority selling
undeveloped graves, unconstructed crypts or niches in
accordance with chapter 68.46 RCW must make available to the
purchaser at the time the prearrangement contract is signed.
• A statement of estimated time schedule of the
development or construction.
Estimated time schedule must:
• Be submitted to the cemetery board annually with the
financial reports required by RCW 68.46.090.
• Be made available to holders of prearrangement
contracts affected by the development or construction in the
offices of the cemetery authority.
A cemetery authority must maintain an equivalent
inventory of constructed crypts, niches and developed graves,
equal to ten percent of the unconstructed crypts, niches and
undeveloped graves sold through prearrangement contracts. The
equivalent inventory must be located within the cemetery or an
adjacent cemetery under common ownership.
Trust fund deposits required for the prearrangement
contract sales of undeveloped property, will be in accordance
with RCW 68.46.030.
[Statutory Authority: RCW 68.05.105 and chapter 34.05 RCW. 07-11-088, § 98-14-080, filed 5/15/07, effective 6/15/07. Statutory Authority: RCW 68.05.100. 02-19-018, § 98-14-080,
filed 9/9/02, effective 10/10/02; 83-02-063 (Order 106), §
98-14-080, filed 1/5/83.]