WAC 51-56-0700
Chapter 7 -- Sanitary drainage.
701.1.2 ABS and PVC DWV piping installations shall be
installed in accordance with IS 5 and IS 9. Except for
individual single family dwelling units, materials exposed
within ducts or plenums shall have a flame-spread index of not
more than 25 and a smoke developed index of not more than 50,
when tested in accordance with the Test for Surface-Burning
Characteristics of the Building Materials (See the Building
Code standards based on ASTM E-84 and ANSI/UL 723).
704.3 Except where specifically required to be connected
indirectly to the drainage system, or when first approved by
the authority having jurisdiction, all plumbing fixtures,
drains, appurtenances, and appliances shall be directly
connected to the drainage system of the building or premises.
710.3 The minimum size of any pump or any discharge pipe from
a sump having a water closet connected thereto shall be not
less than two (2) inches (52 mm).
Sections 710.3.1 through 710.3.3 are not adopted.
CHAPTER 7, PART II -- BUILDING SEWERS
Part II Building Sewers. Delete all of Part II (Sections 713
through 723, and Tables 7-7 and 7-8).
[Statutory Authority: RCW 19.27.190, 19.27.020 and chapters 19.27 and 34.05 RCW. 07-01-094, § 51-56-0700, filed 12/19/06,
effective 7/1/07. Statutory Authority: RCW 19.27.031,
19.27.074. 02-01-114, § 51-56-0700, filed 12/18/01, effective
7/1/02.]