Chapter 16.55
EASTSOUND SUBAREA PLAN
Sections:
16.55.005 Introduction.
16.55.010 Purpose.
16.55.020 Authority.
16.55.030 Official maps.
16.55.040 Applicability.
16.55.045 Definitions.
16.55.050 Amendments.
16.55.060 Eastsound planning review committee.
16.55.070 Appeals.
16.55.080 Severability.
16.55.090 Effective date.
16.55.100 Existing conditions.
16.55.110 General goals and policies.
16.55.120 Open space, historic, and natural features.
16.55.130 Transportation.
16.55.140 Village plan.
16.55.150 Utilities.
16.55.160 Architecture and site design.
16.55.200 Land use districts.
16.55.205 Eastsound Village urban growth area.
16.55.210 Village commercial district.
16.55.215 Service park district.
16.55.220 Village residential district.
16.55.230 Service and light industrial district.
16.55.240 Eastsound residential four units per acre, Eastsound residential two units per acre, Eastsound residential one unit per acre, Eastsound rural residential one unit per five acres, and Eastsound residential 4-to-12 units per acre districts.
16.55.245 Eastsound rural district.
16.55.250 Conservancy overlay district.
16.55.260 Natural district.
16.55.270 Marina district.
16.55.280 Airport use district.
16.55.300 General development standards.
16.55.400 Implementation.
16.55.005 Introduction.
A. History. The Eastsound Subarea Plan was first developed by a group of local residents and business owners, appointed by the board of County commissioners and acting with the advice of the planning department, because the County Comprehensive Plan did not adequately address the planning needs of the Eastsound area. The Eastsound Plan was first adopted in November, 1981, by County Ordinance No. 225-1981.
B. Purpose. By adopting this plan the County established as its policy the maintenance of a subarea plan to provide land use and development goals, policies and regulations specifically for the Eastsound planning area. (Note: in this introduction and throughout the plan, "Eastsound" refers to the entire planning area including the village and surrounding areas, "the village" means the commercial center, represented in the plan as the village commercial district.) Eastsound is the largest unincorporated community in the County. It is the geographic center of Orcas Island and is the commercial and cultural center of the island community.
The Eastsound Subarea Plan, as amended, is to accomplish four primary goals:
1. Identify, conserve, and enhance the qualities of Eastsound that contribute to people’s enjoyment of the place as well as to its functions as the commercial, cultural and residential center of a rural island community and ensure that land uses which adjoin residential uses are compatible with them;
2. Anticipate and manage how change will occur in Eastsound and immediate surroundings, and to provide a tangible vision for future growth so that the qualities that define its character and give it value as a place to live and work are not compromised as growth and change are accommodated; and
3. Provide clear standards for development in Eastsound including standards for buildings, streets and sidewalks, utilities, lighting and allowable uses within each land use district; and
4. To develop a subarea plan that is consistent with the San Juan County Comprehensive Plan, the Shoreline Master Program, and the Washington State Growth Management Act.
C. Organization – Guide to Readers. The plan is most often used to determine what uses are permitted in a given area of Eastsound and then what parking, landscaping and other standards must be met. (The purposes of these standards are found in the goals and policies they are designed to put in effect.) The plan includes an official map that illustrates the boundaries of the different land use districts. The regulations that apply within the districts are found in sections titled: village commercial, commercial and service, village residential, Eastsound residential, Eastsound rural, service and light industrial, airport use, natural, conservancy overlay, and marina. Each of these specifies uses allowed in the district, states what if any permit or approval is required for each use, and sets out the performance and site development standards applied to them (e.g., for parking, signs, landscaping, building scale and setbacks).
D. Relationship to Other Local Plans and Land Use Regulations. The Eastsound Plan is a part of the County Comprehensive Plan. For developments or activities not addressed in the Eastsound Plan the Comprehensive Plan provides the policies and regulations that apply. For example, the Comprehensive Plan contains regulations for grading and road construction that apply in Eastsound since the Eastsound Plan does not address these activities. The Comprehensive Plan may require permits for these activities even if the Eastsound Plan does not require permit approval for the development.
Also, procedures and criteria for approval of permits required by the Eastsound Plan are contained in the Comprehensive Plan, so uses identified in the Eastsound Plan as subject to site plan review or conditional use permit approval are considered under provisions for these permits in the Comprehensive Plan. If a use is not allowed in Eastsound, or in one of its land use districts, it may be allowed elsewhere on Orcas Island, subject to the policies, regulations and land use designations of the Comprehensive Plan.
Parts of Eastsound are also subject to the Shoreline Master Program (SMP), Chapter 18.50 SJCC. The SMP was adopted by the County in 1976 in accordance with the Shoreline Management Act, Chapter 90.58 RCW.
The SMP governs land use and development within 200 feet of the ordinary high water mark on the north and south shores of Eastsound. It contains goals, policies and regulations regarding commercial, residential and industrial development and for marina, dock, bulkhead, fill and other developments on the shorelines. It also includes designations for different shoreline environments in which the SMP regulations may vary. These regulations apply in addition to those of the Eastsound Plan. If the SMP and the Eastsound Plan conflict, the most restrictive provision prevails. For example, if the Eastsound Plan allows a certain use with a district but the SMP does not allow it within the shoreline designation on the property, the SMP would control. Similarly, if the SMP allows a use and this plan does not, this plan prevails.
The SMP also contains permit requirements different than those in the Eastsound Plan. These may apply to a shoreline development proposal even if no permit is required by this plan. (Ord. 4-1996; Ord. 12-1994 Att. A; Ord. 62-1992 § 2)
16.55.010 Purpose.
The purpose of the Eastsound Plan is to provide for the orderly growth of Eastsound while preserving and enhancing the vitality and livability of the entire community. In addition, this plan is to establish a process for action by Orcas Island residents to shape the future form of the islands’ residential, commercial and cultural center and the immediate vicinity. (Ord. 4-1996; Ord. 62-1992 § 2)
16.55.020 Authority.
This subarea plan is adopted pursuant to SJCC 18.30.190 and 18.90.050 of the San Juan County Comprehensive Plan. It was adopted by San Juan County Ordinance No. 225-1981 and amended by Ordinances 43-1983, 62-1992, 12-1994, and 4-1996. (Ord. 4-1996; Ord. 62-1992 § 2)
16.55.030 Official maps.
An official map which delineates districts, public facilities, recreation, open area, and transportation facilities is a part of this subarea plan. This map shows the total area covered by this plan and each of the subarea land use district designations. The map shall be filed and amended in the same manner as other official maps of the Comprehensive Plan, as provided in SJCC 18.10.040, 18.90.020 and 18.90.050.
A. There is hereby made a part of this plan a map which shall be known as the Eastsound Subarea Plan Official Map and referred to as the official map. This shall consist of the original official map adopted by Ordinance No. 62-1992 and all amendments thereto adopted pursuant to SJCC 18.90.020 and 18.90.050. This map shall be filed with the County auditor. The planning department shall maintain a reproducible copy of the official map and shall make copies available for purchase.
B. The official map identifies the land area subject to this plan and the land use districts created herein. Maps contained in this plan which describe the Eastsound urban growth area boundary, planned transportation facilities and other planned capital improvements, and which identify specific natural features, are elements of the official map and are subject to the amendment procedures in SJCC 18.90.020 and 18.90.050. (Ord. 14-2000 § 7(QQ); Ord. 13-2000; Ord. 4-1996; Ord. 62-1992 § 2)
16.55.040 Applicability.
A. General. This subarea plan, also referred to as the Eastsound Plan, provides goals, policies and land use regulations additional to those of the Comprehensive Plan and shall apply to all land and land use activity, and to all structures and facilities, within that area described on the official map. The provisions of this plan shall prevail over any conflicting provision of other portions of the Comprehensive Plan, except as provided in subsection (B) of this section. All other provisions and language of the Comprehensive Plan shall retain their full force and effect.
B. Applicability of Shoreline Master Program. The provisions of this plan are also additional to those of the Shoreline Master Program (Chapter 18.50 SJCC, a subarea plan of the Comprehensive Plan). All developments within jurisdiction of the Shoreline Master Program shall be subject to Chapter 18.50 SJCC and this plan. In the event of any conflict between the Eastsound Plan provisions and the Shoreline Master Program, the most restrictive shall prevail.
C. Nonconforming Uses or Structures. Existing nonconforming uses and structures which are not under the jurisdiction of the Shoreline Master Program shall be subject to Comprehensive Plan SJCC 18.40.310 and the following:
1. Any legally established use existing as of the effective date of the ordinance codified in this chapter which does not conform to the applicable use regulations may be continued if it occurs on the parcel where it occurred on that date and it is not discontinued for more than 24 months thereafter.
2. Structures or developments containing such nonconforming uses may be altered, repaired, or remodeled, if the structure or development is not extended beyond the external dimensions present on June 13, 1996, except as specifically provided below.
3. A legal nonconforming use may be relocated on the parcel where it currently occurs if the gross floor area occupied by the use on the site is unchanged and if all applicable site development and other standards are met, subject to approval of a site plan review.
4. Structures existing on the effective date of the ordinance codified in this chapter which are conforming as to use but which do not meet the site development or architectural standards of this chapter may be expanded, altered, repaired or remodeled if the degree of nonconformity with site development standards is not increased.
5. If a nonconforming use, structure or development is destroyed by fire or other act of nature it may be rebuilt to the configurations existing immediately prior to the time the structure was destroyed; provided, that rebuilding is completed within 24 months from the date of the destruction.
6. Any legally established nonconforming use or structure may be altered, modified or remodeled beyond the external dimensions present on the effective date of the ordinance codified in this chapter for the purpose of providing access required under Chapter 51-20 WAC. The extent of the alterations or modifications shall be limited to the provision of access necessary to comply with Chapter 51-20 WAC, as determined by the County building official.
Any nonconforming use or structure under the jurisdiction of the Shoreline Master Program shall be subject to the nonconforming use provisions in WAC 173-14-055, except for those parcels which are subject to the Eastsound Waterfront Access Plan. Pursuant to the Waterfront Access Plan, the uses and structures on the subject parcels existing as of the effective date of this subarea plan (1996) are deemed conforming to all setback and use requirements of the Subarea Plan and Shoreline Master Program. (Ord. 4-1996; Ord. 12-1994 Att. A; Ord. 62-1992 § 2)
16.55.045 Definitions.
All words shall have their normal and customary meaning, unless specifically defined in this section or Chapter 18.20 SJCC.
"Access street" means a street that functions solely to provide vehicular access to abutting properties.
"Accessory use or structure" means a use or structure incidental and subordinate to a primary use or structure.
"Allowable use" means those land uses and activities which are listed as allowable within each land use district of the Eastsound Subarea Plan, subject to the use limitations and required permits specified in this plan. The identification of a use as allowable does not mean that the use is allowed outright without restriction(s).
"Apartment" means a dwelling unit in a building designed for multiple residential or mixed residential and nonresidential occupancy.
"Camping" means to remain overnight, to erect a tent or other shelter, or to use sleeping equipment, a vehicle or a trailer camper for the purpose or in such a way as will permit remaining overnight, or the establishment, setting up and use of a site or location for cooking and preparation of meals and other related activities.
"Civic and cultural facilities" means structures and related activity areas used by organizations providing educational, social, religious or recreational services to the community; including performance halls, government service offices, facilities for religious assembly, colleges, primary and secondary schools, museums, and libraries.
"Cluster development" means a development design technique that concentrates buildings on a part of the site to allow the remaining land to be used for recreation, common open space, and preservation of environmentally sensitive features.
"Collector street" means a street whose principal function is to carry traffic between access and arterial streets.
"Commercial service" means any service not related to or defined as industrial development or as otherwise defined.
"Conservation easement" means an ownership interest in property which entitles the holder to specifically restrict land use and development for natural resource conservation purposes.
"Construction contractor yards and offices" means service establishments primarily engaged in general contracting or subcontracting in the building construction trades. They include administrative offices, workshops and the indoor or outdoor storage of tools, equipment, materials, and vehicles, etc. While such uses may include displays of goods and products for sale to the public, such sales are incidental to the primary business of sales through the placement of orders for construction or the off-site installation of the products displayed by the contractor.
"Day nursery" means a commercial center for the temporary care of children which does not generally include overnight care and which does not meet the definition of in-home day care facility.
"Drainageway" means a natural or manmade channel by which rainwater and snowmelt are collected, transported and discharged to receiving waters, including but not limited to creeks, ponds, swales, culverts, and storm drains.
"Dry boat storage" means a space on dry land or within a building which is rented to the public for the purpose of storing boats.
"Eastsound" means the land area contained within the boundaries of the Eastsound Plan official map.
"Eastsound swale" means the swale lying west of the boundary of the village commercial and village residential districts as shown on the official Eastsound Plan map and Figure 120-1 in this plan. Maps showing the surveyed boundaries of the Eastsound swale are available at the planning department.
"Floor area ratio (FAR)" means the gross area of all buildings and structures on a lot divided by the total lot area.
"Improvements" means buildings, structures, and parking areas. Landscaping, driveways, utility lines, mailboxes, survey monuments, culverts and other drainageways, switches, transformers, and junction boxes, fences, and similar items.
"Incidental" means subordinate and minor in significance and bearing a reasonable relationship with the primary use.
"Industrial development" means the use of land or the use or construction of structures or facilities for the processing, manufacture and/or storage of finished or partially finished goods.
"Light industrial development" means industrial development that meet the performance standards, bulk controls and other requirements established in the Eastsound Subarea Plan and the Service and Light Industrial District.
"Lot" means a single parcel or tract of land for which a legal description has been recorded in the County auditor’s office or the boundaries of which are shown on a recorded plat.
"Lot coverage" means the surface area of a lot or lots within a single development which is occupied by buildings, excluding roof overhangs and covered porches not used for sales, storage or service.
"Maintenance agreement" means a written agreement between parties to physically maintain a facility for common use in a manner which conforms to standards of adequacy specified in such an agreement.
"Manufacturing" means making products from component parts.
"Medical clinic" means a publicly or privately owned facility for the medical diagnosis and treatment of outpatients involving the group practice of physicians and/or other medical, dental, ophthalmological, chiropractic or veterinary professionals.
"Mini-storage" means a structure(s) containing separate, individual, and private storage spaces of varying sizes leased or rented on individual leases for varying periods of time.
"Moorage" means any over-water facility for securing boats, including docks and piers and mooring buoys, but excluding anchorage and dry boat storage.
"Net use area" means the area used to calculate the required number of parking spaces specified in Table 300-1. Net use area is the gross floor area excluding the following:
a. Circulation areas such as entries and weather vestibules, lobbies, hallways and corridors, stairways, elevators and similar areas which do not have customer/patron uses other than for circulation of people; and
b. Mechanical, custodial and storage areas such as mechanical rooms and chases/shafts, electrical/utility rooms and vaults, toilets, custodial rooms, and areas used solely for storage.
"Nonconforming use" means a use or development in existence on the effective date of the ordinance codified in this chapter which does not conform to the regulations of this plan or which is not allowed outright by this plan.
"Office" means a commercial use which provides business, professional or personal services to customers.
"Open space" means the surface area of a lot or lots within a single development which is in natural vegetation or landscaped, including paving for pedestrian use but excluding buildings, parking areas and driveways.
"Outside storage" means the storage of goods and materials out of doors visible from surrounding properties for periods exceeding 48 hours.
"Playing field" means land area designed and used for outdoor games such as baseball, football, soccer, track events and tennis. It includes outdoor swimming pools.
"Resort" means a land area devoted to providing commercial recreational facilities and related lodgings, sales and personal services primarily serving vacationers, and may or may not include residential uses.
"Street floor level" means the surface elevation of a structure at an entrance from a public street reached by pedestrian without means of stairs or elevators.
"Studio apartment" means a room or suite of rooms without separate living and sleeping quarters, designed for occupancy as a dwelling unit, and located within a building containing multiple dwelling units and/or nonresidential uses.
"Substantial storage space" means that the ratio of covered and uncovered storage area to retail area is greater than two and the gross building area exceeds 10,000 square feet.
"Swale" means a depressed, vegetated, often wet area of land or an open drainageway.
"Transient lodging" means a commercial enterprise which provides lodgings for transient occupancy for any period of less than 30 consecutive days.
"Village" means the area of Eastsound designated on the official Eastsound Plan map as within the village commercial district.
"Warehouse" means a building used primarily for the storage of goods and materials. (Ord. 14-2000 § 7(RR), (SS); Ord. 4-1996; Ord. 12-1994 Att. A; Ord. 62-1992 § 2)
16.55.050 Amendments.
Amendments to this plan shall be subject to procedures established in the Unified Development Code for adoption of subarea plans set out in Chapter 18.90 SJCC. (Ord. 2-1998 § 17(E); Ord. 4-1996; Ord. 62-1992 § 2)
16.55.060 Eastsound planning review committee.
A. Creation. The Eastsound planning review committee is established under authority of this plan (as adopted by Ordinance No. 225-1981 and as amended by Ordinance No. 62-1992, and all subsequent amendments) by the board of County commissioners.
B. Composition. The Eastsound planning review committee shall consist of seven members, resident on Orcas Island, who shall be appointed by the board of County commissioners for terms of two years each so that terms of all members do not coincide. Terms of four members shall be for one year from the date of adoption of the ordinance codified in this chapter and the terms of three members shall be for a period of two years from the anniversary of the date of adoption.
C. Purpose. The purpose of the Eastsound planning review committee is to advise the planning department, the planning commission and the board of County commissioners on land use and development matters affecting Eastsound.
D. Authority. The Eastsound planning review committee shall have authority and responsibility to:
1. Review this plan at least once every three years from the date of adoption; following such review the committee may recommend to the board of County commissioners amendments designed to achieve more effectively the purposes and policies of this plan; review and amendment procedures shall be as set out in SJCC 18.90.050;
2. Review and comment on all applications for redesignation, long and short plats, and conditional use permits and variances required by this plan, and all applications for shoreline permits for development within Eastsound; and review and comment on all environmental determinations issued according to the State Environmental Policy Act for proposed developments in Eastsound;
3. Monitor applications and County permit approvals for other developments within Eastsound to enable effective and comprehensive review of this plan;
4. On request of the administrator or on their own initiative, make recommendations regarding the intent or meaning of any provision of this plan;
5. Fulfill the above responsibilities by action in accordance with bylaws for conduct of the Eastsound planning review committee adopted by the board of County commissioners;
6. As the full committee or a subcommittee appointed by the chair, hold regular meetings with representatives of the Port of Orcas, the public works department, and utility providers for the exchange of information about plans for the extension of services or improvements to facilities within Eastsound; and
7. In order to enable the committee to fulfill its duties and to be adequately informed about pending land use applications in the subarea, the planning director will provide the committee with: (a) current summary reports of all pending land use applications; and (b) complete copies of all applications requested by EPRC. (Ord. 14-2000 § 7(TT); Ord. 4-1996; Ord. 62-1992 § 2)
16.55.070 Appeals.
Appeals shall be in accordance with the procedures set out for appeals in the Unified Development Code (Chapter 18.80 SJCC). (Ord. 2-1998 § 17(F); Ord. 4-1996; Ord. 62-1992 § 2)
16.55.080 Severability.
If any provision of this chapter or its application to any person, legal entity, or circumstance is held invalid, the remainder of this chapter shall not be affected. (Ord. 4-1996; Ord. 62-1992 § 2)
16.55.090 Effective date.
This chapter shall be effective immediately upon adoption by the San Juan County board of commissioners. The effective date of the Eastsound Subarea Plan is June 13, 1996. The effective date of the expanded jurisdiction of the subarea plan (as approved by Ordinance No. 4-1996) is June 13, 1996. (Ord. 4-1996; Ord. 62-1992 § 2)
16.55.100 Existing conditions.
A. Form and Character of Eastsound. The physical features and natural setting are the fundamental elements that form the character of Eastsound. It is located in a natural corridor formed by the hills to the east and west and by salt water to the north and south. It contains a natural water course and wetland, running south from the airport to East Sound, along the west side of this corridor. This supports a dense growth of native trees and shrubs and to the east, in the village, there are still open fields and clumps of evergreens and fruit trees.
Patterns of land development and movement of people in the area are also important elements of the character of Eastsound, particularly in the village. The village is small, with most buildings no larger than two stories and most shops and services within walking distance of each other. It has a rural character derived from several elements: many businesses are located in small, separate wooden houses which were formerly residences; the roads are few and narrow and have no sidewalks; there is little industrial activity and few businesses occupy large areas of land with buildings or outdoor storage.
Once an island hub for the import and export of goods by water, at Fishing Bay, the village has remained the central marketplace for Orcas. Now, though, no docks remain within the village and the transportation pattern is dominated by cars and trucks. Most Orcas Island residents drive to the village to shop and socialize. Visitors arrive in the village in private vehicles, by foot, bicycle, bus, boat or plane.
Economic change has also contributed to the character of Eastsound. No longer the center of an agricultural community, tourists and seasonal residents are now an important part of the Eastsound and island economies. Some Eastsound businesses could not survive without the increase in trade provided by these groups but these businesses also contribute to the year-round population because the goods, services and amenities they provide enrich the quality of life for residents as well. At the same time, tourism increases demands on community services and as the year-round and seasonal populations and tourism grow, there are greater pressures on the capacity of Eastsound to accommodate these demands while it benefits.
B. Changing Conditions in Eastsound. Among the most significant qualities of Eastsound today is the quality and amount of open space, either in open fields or views to the hills and the water. These will be altered or lost as new development occurs. To protect areas that are critical for community recreation and open space purposes, this plan identifies certain natural features in and around the village for conservation.
The present orientation of the village away from the shoreline has, to a degree, been responsible for the relatively untouched appearance of beaches on the south shore. To maintain this, this plan favors making the village shoreline more accessible to the public visually by discouraging development of individual moorages and encouraging provision of view points open to the public in new waterfront developments.
Since adoption of the Eastsound Plan in 1981 the village and immediate surroundings have experienced considerable change. Given the small scale of the village, new buildings can have a relatively strong impact on the character of the area and new uses, particularly commercial uses, can have a major effect on patterns of movement through the village. This plan includes provisions for design of new buildings in a manner that reflects the character of Eastsound, and a circulation plan designed to improve traffic movement and promote a development pattern consistent with the purpose and goals of the plan.
The Eastsound subarea is increasingly becoming the center of residential as well as commercial and cultural activity for Orcas Island. In 1994 EPRC decided to study the concept of extending the boundaries of the Eastsound Subarea Plan to include contiguous land between Terrill Beach Road and the westerly boundary of Sections 11, 14 and 23. There were several reasons for this:
1. Eastsound is located in a lowland between two hills that is a part of a common geographical and watershed area that would best be administered under one subarea plan.
2. The existing land use, growth, and parcel patterns as well as its location in the geographical center of Orcas Island indicates that Eastsound will be the focus of much of the residential and commercial development in order to facilitate the goal of relieving growth pressures from the rural areas.
3. Water sewer and medical services, fire protection, schools, cultural facilities, etc., should be provided to serve the community in a comprehensive and effective manner in Eastsound. Therefore, comprehensive land use planning for this area should be done under a single subarea plan. This will formalize the changing nature of Eastsound and the "saddle" as the largest activity center for Orcas Island.
4. Local residents will have a local forum and, therefore, an enhanced opportunity to participate in land use decisions.
5. To coordinate land use planning for Eastsound in conformance with the requirements of the Growth Management Act and the San Juan County Comprehensive Plan.
C. Political and Economic Conditions. Eastsound is a small, unincorporated area which is the social and economic center of Orcas Island. It does not have a municipal government or budget for planning, public improvements and maintenance of public facilities. These functions rest with San Juan County government. One purpose of this plan is to serve as a policy guide for County actions in distributing funds for the administration and development of community facilities and services which are now or should be in the future provided to Eastsound to maintain and enhance its role as the community center of Orcas Island. (Ord. 4-1996; Ord. 62-1992 § 2)
16.55.110 General goals and policies.
A. 1. Goal. To represent and respond to the specific needs and interests of the Orcas Island community in Eastsound within the County Comprehensive Plan, and to provide a means for community action to shape the future of Eastsound.
2. Statement of Intent. Eastsound is an established community and commercial center with land use and development patterns distinct from those of surrounding areas, and as the primary center for Orcas Island it must respond to the diverse needs and interests of the entire Orcas community. The following policies state how the County Comprehensive Plan will recognize the distinct roles and characteristics of Eastsound.
3. Policies.
a. San Juan County will establish, adopt and maintain a subarea plan which will guide land use and development in Eastsound in a manner that will accomplish the stated purpose and goals of this plan.
i. Land use districts established by this plan should be compatible with and maintain the existing development pattern. This subarea plan will maintain the established land use pattern by containing the most intensive forms of land use and development within the village, with less intensive uses distributed outward toward the perimeters of Eastsound.
ii. A mix of uses should be allowed within different land use districts in a manner compatible with the existing development pattern and the goals of this plan.
iii. This plan will provide for clustering of units within large-scale residential developments in order to maximize the provision of common open space, minimize curb cuts along arterial roadways, and to provide for the efficient provision of utility services. In exchange for waiving the conditional use permit requirement, clustering will be required for large-scale residential development, as defined in each residential land use designation.
b. San Juan County will promote communication and cooperation among agencies and districts whose services and facilities affect Eastsound.
B. 1. Goal. Conserve and protect the physical and visual qualities that contribute to the enjoyment of Eastsound and surrounding areas by island residents.
2. Statement of Intent. The natural setting of Eastsound and the features of the natural and built environments within it are fundamental to its character. Principal landscape features include wetlands, shorelines, hills, woods and fields that influence the form and visual quality of Eastsound.
The existing patterns of land use and the features of the built environment are also important components of the character of Eastsound. Many Eastsound buildings are or resemble structures built early in local history. By their numbers, locations, and relative harmony in form, scale and materials, they contribute a cohesiveness to the landscape, particularly in the village and its immediate surroundings.
These features of the natural and built environments define the informal, rural and aesthetically pleasing character this plan is designed to maintain and conserve.
3. Policies. To accomplish this goal, this plan will:
a. Identify specific natural features and characteristics and public vistas which warrant conservation and establish policies and standards for land use and development that will conserve them.
b. Establish minimum building design and site planning standards, based on the scale and character of existing buildings, that promote the visual harmony desired in Eastsound while preserving the present scale and allowing a diversity of individual buildings.
c. Provide a tangible vision and direction for the future of Eastsound which will enhance the existing character and guide the establishment of:
i. A "village square" or public open space that will serve both as a meeting and activity space as well as a visual focus in the heart of the village;
ii. A public access plan for the village waterfront which will enhance the visual and physical connections between the waterfront and public pedestrian ways; and
iii. A plan for the construction and improvement of public streets with associated on- and off-street parking facilities.
C. 1. Goal. Anticipate and manage how growth occurs in Eastsound so that its character is not compromised unnecessarily as growth and change are accommodated.
2. Statement of Intent. Population growth and local and regional economic changes experienced since 1981, when the original subarea plan for Eastsound was adopted, have increased pressure on Eastsound to meet the diverse needs and interests of the Orcas Island community. This plan must establish how growth can be accommodated if the community activities, character and visual quality of Eastsound are to be maintained in the face of this pressure.
3. Policies.
a. Arrange the distribution of various land uses in and around the village in a way that maintains the small-scale of the village and that serves primarily the desires and interests of island residents. Therefore, this plan will:
i. Make sufficient land area available to provide for orderly but concentrated commercial growth in the village in a manner responsive to the daily convenience needs of Orcas residents and which conserves natural landscape features that enhance the village character.
ii. Encourage location of civic and cultural facilities within the village to maintain its economic and social vitality.
iii. Contain and concentrate new commercial uses in the village to reduce vehicular traffic and make the village pleasant and convenient for pedestrians.
iv. Encourage multifamily residential development in and around the village so that more island residents can walk, rather than drive, to destinations in the village.
v. Increase the number and quality of waterfront spaces open to the public for enjoyment of the shoreline and water, subject to an adopted access plan, and encourage pedestrian traffic within the village by ensuring that these waterfront spaces are connected with planned upland paths.
vi. Provide for land area for commercial services and institutional uses at the eastern edge of Eastsound, in the general area of Terrill Beach Road and south of the Mt. Baker Bypass, where there is an existing pattern of commercial institutional, residential, and service land uses.
b. Maintain the historical pattern of residential use in and adjacent to the village and provide for medium- to high-density residential development within an area currently served by central sewer and water systems and within convenient walking distance of schools and services. Therefore, this plan will:
i. Encourage development of multifamily housing in and immediately adjoining the village by establishing land use districts to include comparatively high-density residential development, particularly for multifamily developments.
ii. Provide for medium-density residential development in areas not adjacent but convenient to the village by establishing a residential use district which includes fewer, or less intensive, nonresidential activities.
iii. Encourage new residential development as a secondary, accessory use in areas of Eastsound planned primarily for nonresidential uses.
iv. Provide land for and encourage affordable housing alternatives. The Subarea Plan provides for a density of six to eight units per acre in the village residential district, with a density bonus of four additional units per acre for developments which provide 30 percent studio and one-bedroom apartments or 50 percent low-income rental assistance subsidized apartments.
v. Encourage the remaining agricultural land in Eastsound to be used for agricultural pursuits by establishing an Eastsound rural district within the subarea. This district includes those areas formerly designated Rural-5 in the County Comprehensive Plan. Allowable uses are generally limited to agricultural uses and activities and single-family residential use at a density of one unit per five acres.
c. Provide adequate land area for commercial and industrial uses that are not appropriate in the village but that are logically located conveniently to the village, while avoiding conflicts with other land uses. Therefore, this plan will:
i. Establish a land use district on and around the Eastsound airport to accommodate uses that are related to use of the airport and/or provide storage, distribution, manufacturing or repair services which are most convenient to the village and the Orcas community as a whole if located in Eastsound.
ii. Establish the service park land use district located near the Horseshoe Highway and Terrill Beach Road intersection which recognizes the existing patterns of commercial, institutional, service, and residential uses. This district provides room for future expansion and includes performance standards to ensure that the allowable uses are compatible with existing residential uses in the district and surrounding area.
iii. Minimize conflicts between the airport and surrounding residential uses by providing land area between these for uses less intensive than, but not incompatible with, airport use.
d. Recognize the existing commercial uses on the north shore and allow for additional commercial development which will enhance opportunities for the public to enjoy the shoreline. Therefore, this plan will:
i. Establish a land use district on the north shore immediately east of the airport which provides for commercial developments compatible with adjoining land uses, the physical limitations of the land, and the policies and regulations of the Shoreline Master Program applied to this location.
ii. Allow for residential uses of a relatively high density which are compatible with existing and planned commercial uses in the area.
D. 1. Goal. Allow growth and development in Eastsound which can be supported by central water and sewer systems.
2. Policy. To achieve this goal:
a. Provide information which will support achievement of this goal, including descriptions of existing utilities, their service capacities, and plans for long-term service expansion.
b. Sewer and water system information should be updated and elaborated with the adoption of a capital facilities plan for Eastsound and its environs that is consistent with the County-wide Comprehensive Plan developed in accordance with the Growth Management Act.
c. Water and sewer system capital facility planning and construction within Eastsound shall be based upon the Eastsound Subarea Plan land use designations and the uses, densities, and activities allowed by those designations.
E. 1. Goal. Develop a transportation system that enhances the character of Eastsound while providing safe and efficient vehicular and pedestrian circulation through and around Eastsound.
2. Policy. To achieve this goal:
a. The Transportation Plan (Figure 130-1) will be used for the orderly and timely acquisition of rights-of-way.
b. The Transportation Plan will be used to establish priorities for capital improvements in Eastsound.
c. The Transportation Plan will provide a vehicular bypass of the village for through trips.
d. The Transportation Plan will concentrate nonresidential development in the village and direct the pattern of development around the village in a manner that maintains the scale of Eastsound.
e. A public parking plan will be developed for the village.
F. 1. Goal. Encourage the creation of a combination of public and private off-street parking that will satisfy the parking needs of Orcas Island residents, visitors, and businesses in the village commercial district.
2. Policy. To achieve this goal:
a. A public parking plan will be developed for the village that will:
i. Provide sufficient off-street parking to mitigate the need for on-street parking.
ii. Encourage development of off-street parking that will be designed and landscaped to minimize the aesthetic impact on the village.
iii. Convert all existing private on-street parking into public on-street parking by appropriate dedication of rights-of-way, as streets in the village are improved.
iv. Provide for the acceptance of fees and the dedication or gift of land and/or easements in lieu of providing required off-street parking or in conjunction with a public road project or as detailed in the Eastsound Waterfront Access Plan.
b. Parking requirements for the village commercial district are based upon the following principles:
i. Parking in the village is both a private and public responsibility which requires cooperative efforts between the public and private domain in order to achieve the objectives of this plan.
ii. Parking that is open to the public and not restricted as to use shall be encouraged over designated private parking.
iii. To the maximum extent possible the County will endeavor to provide additional public parking in conjunction with the development of the proposed village square, County office facilities, and other public uses which may be established.
G. 1. Goal. Protect marine and fresh water environments from degradation by storm water.
2. Policy. Develop an Eastsound storm water plan and adopt implementation regulations consistent with best management practices. This should be coordinated with a plan for management of the East Sound watershed, which is to be developed through a Centennial Clean Water Fund grant between 1996 and 1993. (Ord. 4-1996; Ord. 62-1992 § 2)
16.55.120 Open space, historic, and natural features.
A. Purpose.
1. To identify and protect specific open spaces and natural features which are key to maintaining the physical character and visual quality of Eastsound.
2. To protect specific natural resources that contribute to the environmental quality of Eastsound and the surrounding area.
3. To identify, recognize, and protect features of the built environment with historical significance.
B. Policies.
1. Enhance the accessibility of the East Sound waterfront to the public by improving the number and quality of shoreline views from within the village and along the East Sound shoreline.
2. Ensure preservation and conservation of natural resources and natural landscape features in all new development so that natural grades and vegetation are maintained and so that wetlands and specific natural landmarks and other key features are undisturbed.
3. Establish a process and schedule for acquisition and/or dedication of easements to provide permanent protection of key natural resources and features.
4. Specify development limitations necessary to minimize degradation of key open areas and natural resources and features and apply protective regulations to development in addition to other site development standards and land use regulations in this plan. A conservancy overlay district should apply such development limitations to specific resources and features, as shown in Figure 120-1. (These limitations are contained in SJCC 16.55.250.)
5. Amend the map of open space and natural features in Figure 120-1 as necessary to ensure identification of important resources and to incorporate new information.
C. Description (for Regulations see Conservancy Overlay District, SJCC 16.55.250).
1. Lavender Farm Knoll. This knoll is a natural landmark in central Eastsound.
2. Eastsound Swale. The swale is a natural boundary between the village and the airport and residential area west of the village. The dense vegetation in and along the swale is a prominent visual feature that offers an attractive edge for a pedestrian walkway.
This natural drainageway is a key component of the Eastsound watershed and of East Sound water quality it provides an important public benefit by controlling flooding and by filtering sediments from storm water, which help to maintain surface water quality. Land clearing and development in wetlands results in increased erosion; degradation of water quality from sedimentation and from loss of biofiltration from vegetation; loss of detention capacity which results in flooding; and adversely affects the quality of receiving waters, and therefore degrades fish and shellfish habitat. Also, certain types of land uses and development activities introduce petroleum products, pesticides, herbicides and other pollutants.
3. Waterfront Park. A low-bank parcel at the west edge of the East Sound shoreline provides dramatic views of the water and the Eastsound shoreline. The County acquired it for public park use.
4. East Sound Waterfront. Because the most characteristic and significant natural feature of Eastsound is its location at the head of East Sound, and because a goal of this plan is to increase visual and physical shoreline access to the public, the County and the owners of village commercial waterfront property have developed and agreed upon an Eastsound waterfront access plan, which is set forth herein. Figure 130-6 shows the visual and physical access corridors provided to East Sound.
5. Madrona Point Dock and Beach. This element is identified in this plan as a possible endpoint for a public access path along the beach east from the proposed waterfront park (subsection (C)(3) of this section). A public dock site and beach access from Haven Road have been secured by the County. When completed, the dock will provide the primary moorage facility for transient boat access to dock access to Eastsound. This dock is intended for temporary tie-up use.
6. Madrona Point. This prominent wooded peninsula is of great historic, scenic and cultural importance. Once faced with development into shoreline lots and condominium sites, it was purchased by the Bureau of Indian Affairs for the Lummi Indians on the condition that it be preserved as a natural area.
7. Buck Park. This property is located immediately east of the school and was donated to the community for development of a public park.
8. Significant Views. Views of the water significant to the character and visual quality of Eastsound are identified in Figure 120-1, below.
9. Village Entrance and Edge Features. The village is entered through three distinctive natural entranceways or "gates" composed of road offsets crowded by adjacent hills and trees. These gates are formed as follows:
a. The west gate is the stand of trees and surrounding open area at the waterfront park site and the crowding hill of Landmark Inn opposite together with the large firs at the edge of Lovers’ Lane.
b. The east gate is on Main Street at the east end of Madrona Point at Crescent Beach.
c. The north gate is the North Beach Road entrance to Eastsound, just north of High School Road where Purdue Hill and the trees opposite on the east crowd to the road edge.
10. Eastsound entrance and edge features. The County-owned property at the Terrill Beach and Horseshoe Highway intersection is a prominent site that should be improved and maintained as a roadside park.
11. Village Square. A public space or village square at the center of the retail area. This is necessary as the focal "place" or center of activity of the village. It is to be located at the hub of village social and retail activity and provide space for festivals, formal and informal meetings, information, markets, and parking. This space should be an open, pedestrian area with grass, landscaping and paths, and should adjoin the Historical Museum which currently serves some of the same functions.
12. North Shore. This shoreline has gently sloping sandy beaches and views of Sucia Island, Georgia Strait, and summer sunsets. Three road ends with public access exist within the planning area.
13. Wetlands. All areas shown on the San Juan County 1993 Wetland Inventory Maps. These maps are intended to depict the general locations of known regulated wetlands. The maps do not show specific wetland boundaries or buffers but rather indicate the approximate locations of wetlands. Individual, site specific, investigations and/or wetland delineations may be required in the permit review processes required by this plan or other County land use regulations.
14. Western Hill. The wooded hill west of the village, along Lovers’ Lane, is an important view and an enclosing element.
15. Mount Baker Edge and View. The eastern approach to Eastsound on Mount Baker Road and view of Mount Baker from this road. The significant characteristic here is a roadway bordered on one side by open fields (affording the view) and woods on the other.
16. Crescent Beach Marsh. This marsh east of Eastsound is under the Shoreline Master Program jurisdiction as a wetland associated with Ship Bay. A portion of the marsh is owned by the San Juan Preservation Trust. It is recognized as a feature important to Eastsound because drainage from the east end of the village flows to the marsh.
17. Regulated Wetlands. All wetlands listed in the SJC wetlands maps.
18. Mount Baker Road Agricultural Property. The land along Mt. Baker Road from Terrill Beach to North Beach Road. The significant characteristic here is rural open space and views of Mt. Baker.
19. Crescent Beach Waterfront. The waterfront and beach along Crescent Beach from Eastsound Village to Terrill Beach Road. This feature is recognized as important because it is a vital component of the Crescent Beach Marsh wetlands system, with oyster beds, unparalleled marine views, and a sensitive coastal ecology.
20. Emmanuel Episcopal Church. The Emmanuel Church is recognized for its historical significance and reflection of early architectural style in San Juan County. The church is listed on the National Register of Historic Places.
21. The Orcas Island Historical Museum. The museum is recognized for its historical collection and reflection of early history of San Juan County. (Ord. 4-1996; Ord. 62-1992 § 2)
16.55.130 Transportation.
A. Purpose.
1. To provide for the orderly development of roads and paths.
2. To construct roads and paths consistent with the character of Eastsound and this plan.
3. To provide for the timely acquisition of road rights-of-way.
4. To ensure the transportation system serves the land use goals and policies of this plan.
5. To provide for the participation of property owners in the design of road and path improvements.
6. To implement a streetscape improvement program for the village that supports the policies of this plan to make the village pleasant and convenient for pedestrians and also provide needed on-street parking.
7. To create a parking plan that will provide for adequate off-street public parking.
B. Vehicular Circulation Policies.
1. Figure 130-1 is the vehicular circulation plan for Eastsound.
2. The County should acquire rights-of-way shown in Figure 130-1 not currently owned by the County.
3. The bypass route shown in Figure 130-1 should be improved for use as the major link between Orcas and Olga and should be developed in a manner that will make its use desirable for through traffic, including the restriction or combination of driveway cuts along the bypass. The County has adopted restrictions (Ordinance No. 3-1995) on the use of Horseshoe Highway (Main Street) which require use of the bypass, particularly by large trucks, to reduce traffic congestion in the village.
4. Streets within the village should be developed as access and feeder streets, not through streets.
5. Property owners are responsible for improvements to unopened rights-of-way at the time their property is developed if alternative vehicular access is unavailable.
6. The County is responsible for all public road development in Eastsound.
7. Installation of new utility lines and undergrounding of aerial lines shall be coordinated with construction and improvement of public streets to the extent possible.
8. If and when an alternative access route is desired to serve Eastsound from the east, south of Mount Baker Road, this should be provided by extension of Rose Street to the east. High School Road should then be extended to connect with Rose Street. This alternative access could lead to a reduction of vehicular traffic on Crescent Beach Road.
9. The Fern Street extension shown in Figure 130-1 should be built after a village square of at least 20,000 square feet is acquired by the County (Figure 140-1).
10. Enchanted Forest Road should be extended to connect Lovers’ Lane to North Beach Road.
C. Street Development Standards.
1. Existing public streets shall be improved to comply with the configurations specified in Figures 130-2 through 130-4.
2. Curbs, gutters, sidewalks and street trees are required for streets within the village and shall comply with all standard details.
3. The County will provide curbs, gutters, sidewalks and street trees when public street improvements are made and sufficient right-of-way exists. If the right-of-way is insufficient the County will make these improvements if the necessary right-of-way is dedicated. If property owners are unwilling to dedicate right-of-way the County may choose to forgo curbs, gutters, sidewalks, and street trees, or use some other means of financing such as LID, grants, local funds, etc.
4. When the County improves a street with insufficient right-of-way (according to Figure 130-1), curbs, gutters, sidewalks and street trees will be installed when property owners dedicate appropriate right-of-way. The board of County commissioners may adjust street improvement standards required by this plan in adoption of an improvement plan for a specific street.
5. Property owners shall install, or agree to install at a future date under specific conditions, curbs, gutters, sidewalks and street trees when their property adjoining public streets is developed, when an existing use is substantially expanded, or when a change of use occurs or when improvements of a fair market value of at least $25,000 are made to the property. The department of public works shall be responsible for establishing the grades at the street sufficient to determine the proper location of the improvements called for in this paragraph so that they will be in alignment with other future street improvements. If public works has not completed a design for the street or cannot furnish the necessary information, the improvements shall not be required until such time as public works has established the necessary grades and design standards for the required improvements. As a part of any agreement to install improvements at a future date the property owner shall agree to participate in a street improvement program for the entire street when it is implemented.
6. New public street rights-of-way shall be at least 60 feet wide in Eastsound and at least 50 feet wide within the village.
7. Street trees should be located as illustrated in Figure 130-4. On any given street, species of large shade trees and flowering ornamental trees should be uniform, and selected by agreement of a simple majority of the affected property owners, unless a specific species has been selected as part of an adopted plan for improvements to a particular street. Figure 130-5 contains a list of suggested trees.
8. Maintenance agreements for street accessories (street trees, sidewalks, landscaping, etc.) shall be required prior to occupancy of any new or substantially expanded use and as a condition of participation in any street improvement program as provided for in this section.
D. Pedestrian Policies.
1. The village should be developed in a manner convenient and attractive for pedestrians, with safe and pleasant walks and paths.
2. The pedestrian path system for Eastsound is shown in Figure 130-1. Public path rights-of-way should have a minimum width of five feet.
3. Public paths shown in Figure 130-1 should be provided by dedication of easements to the public by the owner at the time the property is developed.
4. The waterfront access points provided in accordance with the Eastsound Waterfront Access Plan are shown in Figure 130-6.
E. Parking Policies. The development of off-street parking areas open to the public should occur where it will serve substantial portions of the village. A public parking authority should be established to provide for the creation, management and maintenance of such parking areas. Donation of ROW for street improvements should be compensated by a credit to the property owner for each on-street parking space resulting from the donation, against the number of spaces required for the use of the property. The public parking plan will provide for concepts such as payment of a fee, gifts or dedications of land and the grant of visual and physical waterfront public access (pursuant to the Eastsound Waterfront Access Plan), in lieu of providing off-street parking. Owners who give or dedicate land and/or easements shall be compensated by a credit to the property owner for a number of parking spaces equal to the assumed value of the land and/or easements conveyed. Fees collected will be held in a fund to be used exclusively for the acquisition of land and construction of public parking areas.
F. Airport Development. The Orcas Island airport at Eastsound is owned and operated by the Port of Orcas. The facility is used by private pilots, some resident, and it also provides scheduled passenger service to other islands and to the mainland. To maintain the function of the Mount Baker Road Bypass and to protect the future land use pattern intended by this plan, no runway extension should be allowed south of Mt. Baker Road. (Ord. 4-1996; Ord. 62-1992 § 2)
16.55.140 Village plan.
A. Figure 140-1 illustrates the elements of open space, historic, and natural features and circulation within the village. The plan includes the extensions of (1) Rose Street to Madrona Street, (2) Enchanted Forest Road from Lovers’ Lane to North Beach Road, and (3) Fern Street from Madrona Street to Lovers’ Lane, in addition to other internal street improvements as well as new street construction to improve traffic circulation into and out of the village. (Also, refer to SJCC 16.55.120, Open space, historic, and natural features; SJCC 16.55.130, Transportation; and SJCC 16.55.250, Conservation overlay district.)
B. The village plan includes a location for the village square. The square is intended to satisfy several public functions, including public open space and an informal meeting place. It is located centrally and has convenient connections to public parking, streets, and pedestrian paths.
C. When adopted, a public access plan will identify the specific village waterfront access locations for pedestrian use. (Ord. 4-1996; Ord. 62-1992 § 2)
16.55.150 Utilities.
A. Purpose.
1. Promote cooperation between utility services, the County and property owners for provision of adequate water supply and sewage disposal services and electrical and telephone distribution lines within utility service areas in Eastsound.
2. Provide direction for improvements to publicly owned and/or maintained storm drainage systems to enhance natural drainage patterns, to maintain and improve quality of receiving waters, including Fishing Bay, and to coordinate such improvements with transportation planning and street construction schedules.
3. Promote long-range planning for delivery of sewer and water services which is consistent with the land use and parcel patterns provided for in this plan.
B. Policies.
1. Storm Drainage Policies. The County should develop a stormwater management plan for Eastsound which will recognize the natural limitations and benefits of the Eastsound swale to detain and filter runoff from streets, parking areas and other impervious surfaces. This plan should include:
a. Relocation of release locations for storm drains north of A Street to a water quality and peak runoff control facility before emptying to the Eastsound swale;
b. Identification of areas for drainage easement acquisition;
c. Acquisition of rights to use, improve and maintain for water quality management purposes the two-celled pond located at the base of the Eastsound swale which empties at an outfall at Fishing Bay; and
d. Stormwater management standards and criteria (which may modify or replace standards in SJCC 16.55.300(F)).
To decrease water quality impacts and sediment loading of the Eastsound swale, new development on property draining to the swale should include on-site surface runoff detention and filtration during construction and provide permanent drainage control facilities to filter sediments and maintain runoff rates at pre-project levels. Applications for all such developments should include a complete drainage and grading plan.
2. Cable, Telephone, Power, Water and Sewer Utilities. Utility lines serving new development should be installed underground to reduce adverse visual impacts and should be installed within road rights-of-way to reduce adverse effects on the physical environment.
3. Utility Coordination. County planning for street construction should be coordinated with improvement plans of public and private utilities.
C. Utility Development Standards.
1. Utility lines serving new or significantly expanded uses shall be installed underground.
2. Street lighting, if provided, shall have a shielded source (e.g., McGraw-Edison "Concourse" or similar fixtures without bare bulbs) and be uniform throughout the village.
D. Existing Utilities. To provide a useful reference the description of existing utilities within the planning area, given below, should be updated and detailed upon adoption of a capital facilities plan for Eastsound.
1. Sewer. Sewer service for Eastsound is provided by the Eastsound Sewer and Water District, a public utility supported by a local improvement district. The boundaries of the LID as well as the location of the principal collection facilities are shown on Figure 150-1. In addition, the sewer district is authorized by charter to provide sewer service throughout the subarea.
a. District facilities fall into three categories:
(i) All users have an on-site septic tank and effluent pump. The owner is charged for this in addition to the facility charge and the connection fee.
(ii) From the individual septic tank, primary treated effluent is pumped through pressure mains to the treatment plant located by the airport, where effluent receives secondary treatment, aeration and settling, as well as tertiary treatment (chlorination). This plant has a capacity of 80,000 gallons/day and is currently operating at half capacity.
(iii) Treated effluent is piped to an outfall in the Straits of Georgia off the north shore of Eastsound.
b. District policies require that all development within the LID must connect to the system. On-site construction requires a septic tank of 500 gallons per residential unit equivalent.
c. The treatment facility is presently operating at approximately half capacity, i.e., with 400 connections and 40,000 gallons/day. The district has a long range plan to expand this treatment plant by an additional 80,000 gallons/day when the present plant reaches 600 connections or 60,000 gallons/day. In order for sewer district services and capital facility improvements to be consistent with the County Comprehensive Plan and the Growth Management Act, a long-range sewer system plan should be developed for Eastsound. The sewer system plan should be consistent with the Land Division Ordinance (Chapter 18.70 SJCC), ownership, and use patterns throughout the subarea.
2. Water. Water service for Eastsound is provided by the Eastsound Water Users Association (EWUA), a private member-owned utility company. The EWUA adopted a Comprehensive Water System Plan in 1990 (to be updated in 1995) which is used to help guide operations. The plan provides detailed information about system source capacity, water consumption patterns, and long-range plans for system improvements. The entire Eastsound Subarea is located within the boundaries of the EWUA service area and long-range planning takes into consideration the total potential buildout provided for in the subarea plan.
One time fees for new memberships and hookups are used to fund capital expenditures. Monthly usage charges pay for the costs of maintenance and operations. The board of directors is elected by the membership and system operations and fees are controlled by the board and EWUA adopted bylaws.
Water for the system is supplied from drilled wells and the Purdue Lake reservoir located on Buck Mountain. The system is designed and operated to meet state of Washington standards for public water systems. The EWUA reserves the right to give domestic use priority over other uses in the event of a temporary shortage of water.
The existing system is also designed to meet residential fire-flow requirements (500 GPM for 20 minutes) throughout the Eastsound Subarea Plan jurisdiction. The EWUA also designs all new line extensions to meet minimum fire-flow requirements. (Ord. 4-1996; Ord. 62-1992 § 2)
16.55.160 Architecture and site design.
A. Purpose. To establish architectural guidelines and site planning standards to ensure that new development projects harmonize with, reinforce and strengthen the existing character and scale of Eastsound.
B. Intent.
1. To acknowledge that it is the desire of the community to maintain the existing character and scale of Eastsound; and to recognize that, in the face of growth and development pressures, this requires making conscious choices with regard to form, height, size, placement of buildings on lots, and exterior materials used in new developments in Eastsound.
2. To balance the idea that the built environment of Eastsound is not a pristine architectural expression in need of protection and preservation, with the awareness that much of the existing character and scale is nonetheless valued by the community and is threatened by indiscriminate growth and development.
3. To raise the level of probability that as Eastsound grows, new buildings, while each being different, will complement one another and blend together as parts of a harmonious whole.
4. To identify the specific elements which define the existing character and scale of the built environment of Eastsound.
5. To acknowledge that the spaces around buildings contribute to the character and scale and to establish site planning standards so that new development maintains the existing fabric of Eastsound.
6. To recognize that the changing needs of the community and the businesses which serve it may require some buildings which exceed the size of existing buildings and to ensure that such buildings are designed and constructed in a manner consistent with the purpose and intent of this section.
7. To recognize that new growth pressures have fostered the need for public improvements in Eastsound including on-street parking, sidewalks and amenities such as landscaping and street trees.
C. Design Elements. The character and scale of Eastsound can be defined by describing the elements of the existing development pattern. The elements of this pattern provide the basis for the site planning and development standards in this section.
1. Eastsound includes a number of buildings which, although not necessarily of historic significance or representing a formal style of architecture, are the result of the efforts of early settlers and craftsmen who approached construction in a straightforward manner; they used basic carpentry skills to create shelter while addressing the problems posed by climate, economic and cultural needs, and available materials.
2. The following characteristics define the physical and aesthetic character and scale of Eastsound as determined by existing conditions:
a. They are placed in the foreground of their lots with a close relationship to the public street and with side yard spaces separating them from adjacent buildings.
b. They are relatively small structures; some are residences converted to commercial use.
c. They are one and two story wood-framed buildings whose principal roofs have a relatively steep slope.
d. They are often accompanied by pleasant and attractive open spaces visible from the street.
D. Policies. In order to accomplish the purpose and intent of this section, the following policies are established:
1. To acknowledge that these characteristics are most significant in the village and the area immediately surrounding it, architectural standards apply only in the village commercial and residential districts.
2. To maintain the design elements noted above, which are both diverse and harmonious, it is important that new building construction reflect the mass, height, roof form, and materials found in most existing Eastsound buildings. These characteristics are illustrated in Figure 300-3.
3. To recognize that prescriptive standards intended to ensure both diversity and harmony of design in new developments may not be responsive to special problems or opportunities, it is desirable that a discretionary option to the strict application of architectural standards be provided. (Ord. 4-1996; Ord. 12-1994 Att. A; Ord. 62-1992 § 2)
16.55.200 Land use districts.
A. The following districts are hereby created based on existing land use patterns, natural features and land capabilities, coordination with the Shoreline Master Program, and the needs and desires of the Orcas community as expressed in the goals and policies of this plan. The districts are:
1. Village commercial;
2. Village residential;
3. Service and light industrial;
4. Eastsound residential four units per acre, Eastsound residential two units per acre, Eastsound residential one unit per acre, Eastsound rural residential one unit per five acres, and Eastsound residential 4-to-12 units per acre districts;
5. Conservancy overlay;
6. Natural;
7. Marina;
8. Airport use;
9. Eastsound rural;
10. Service park.
B. These districts apply to land areas within Eastsound as described on the official map. Figure 200-1 shows the location and boundaries of the districts.
C. On the official map some designations are noted with the letter "P" to identify those locations where site planning is required under SJCC 18.60.220. This planning is necessary to ensure that development at less than four units per acre density will not preclude possible future development at urban-level densities (four units per acre or higher). New residential development in such areas is subject to approval by the administrator for this purpose. (Ord. 13-2000; Ord. 4-1996; Ord. 12-1994 Att. A; Ord. 62-1992 § 2)
16.55.205 Eastsound Village urban growth area.
A. The boundary of the Eastsound urban growth area within the Eastsound planning area is shown on the Eastsound official map.
B. The standards of SJCC 18.60.240 shall apply to all new development and all substantial alterations to a building or facility within the Eastsound urban growth area. A substantial alteration is where the total cost of all alterations (including but not limited to electrical, mechanical, plumbing, and structural changes) for a building or facility within any 12-month period or single development permit application amounts to 50 percent or more of the value of the building or facility. In determining the current value of the building or facility, the assessor’s fair market value, or a current appraisal acceptable to the County, may be used.
C. A density bonus for affordable housing can be done to the maximum duration allowed by law to achieve four to six units per acre of affordable housing for moderate income or up to eight units per acre for low income wherever land use density is now four units per acre or less within the Eastsound urban growth area exclusive of those parcels that are within 200 feet of the shoreline, defined critical areas, or that otherwise contain physical characteristics making them unsuitable for urban level development. (Ord. 13-2005 § 2; Ord. 13-2000)
16.55.210 Village commercial district.
Note: See also SJCC 16.55.300, General development standards, for permit, landscaping, parking, architectural design, signs, lighting, etc., requirements.
A. Purpose.
1. To provide for a concentrated village that will centralize commercial and community-wide social and cultural activities in a relatively small area, but which is large enough to allow for reasonable growth;
2. To retain as much as possible of the existing village character as defined by the general goals and policies in SJCC 16.55.110;
3. To allow for development that preserves the existing character, natural features and visual qualities of the village by imposing specific development standards, including building height and setbacks, open space, and landscaping;
4. To consolidate development in such a manner to allow walking from one destination to another to the greatest extent possible; and to make walking a pleasant alternative to driving between destinations by specifying street-orientation of buildings and imposing street improvement and landscaping requirements, and by encouraging provision of public pedestrian access to and along the waterfront;
5. To encourage creation of community parking facilities and the shared use of off-street parking areas in locations that will help promote pedestrian traffic among village destinations; and
6. To allow a mixture of residential and commercial uses while protecting adjoining residential areas from uses which typically generate noise, traffic or evening activities incompatible with residential neighborhoods.
B. Allowable and Prohibited Uses. Land uses not specifically listed in this subsection as either allowable or prohibited may be allowed subject to conditional use permit approval. Allowable uses are subject to the required permits and use limitations and the site development and performance standards stated in this section.
The following uses are allowable in the village commercial district:
Commercial:
1. Adult day care
2. Day nursery
3. Equipment rental services
4. Laundry/laundromat
5. Medical clinic
6. Commercial nurseries and retail plant sales
7. Office (business and personal and professional service)
8. Recreational indoor facilities
9. Restaurants and taverns
10. Retail sales
11. Theaters
12. Transient lodging
Institutional:
1. Community club or community organization facility
2. Cultural facility
3. Library
4. Museum
5. Post office
6. Religious assembly facility
7. College or technical school/adult education facility and primary and secondary school facilities as specified in this section
Recreational:
1. Indoor and outdoor noncommercial recreational facilities
2. Parks
Residential:
1. Single-family dwelling unit or a single apartment unit accessory to another allowable use
2. Multifamily dwelling units
3. Group housing
4. Home occupation
5. Home day care
Transportation:
1. Parking, off-site (on-site parking is allowed to serve allowable uses) and driveways
2. Streets, public and private
Utilities:
1. Water, power, cable TV, telephone, and sewer distribution lines
2. Utility service office
3. Utility storage building
The following uses are prohibited in the village commercial district:
Commercial/Industrial:
1. Automotive services
2. Manufacturing
Recreational:
1. Camping facilities
C. Residential Density. Minimum and maximum allowable residential density is as specified on the official map, as amended.
D. Required Permits and Use Limitations.
1. All developments 4,000 square feet or larger in gross use area shall be subject to site plan review requirements.
2. Construction of or improvements to streets, pedestrian paths and off-site parking areas shall be subject to site plan review requirements. (Parking spaces, driveways and paths required for an allowable use shall not require a permit separate from any permit required for the use served; provided, that a road access permit must be granted for construction of any driveway entering a public road.)
3. Automotive service, retail sales, laundries/laundromats, equipment rentals, restaurants and post offices shall be prohibited within that portion of this district described as follows: between High School and Rose Streets and east of Pine Street, and all area east of Madrona Street.
4. Classroom uses for primary and secondary education are allowed outright if parking is provided in conformance with requirements in SJCC 16.55.300(B).
E. Site Development and Performance Standards.
1. Building Height. No building shall exceed 32 feet as measured from average existing grade to the highest point of the highest roof structure (excluding church spires if area at the base is not larger than five percent of building floor area).
2. Building Setbacks.
a. No building shall be built closer than 30 feet to the centerline of a public right-of-way.
b. Building setbacks from shorelines shall be subject to policies and regulations in Chapter 18.50 SJCC, the Shoreline Master Program.
c. Each side yard shall be at least five feet in width. Architectural appendages (i.e., roof overhangs, chimneys, bay windows, and decks not over 30 inches above grade) may extend two feet into required yards.
d. Building setbacks for existing, expanded, new, or replacement structures on properties within the geographical scope of the Eastsound Waterfront Access Plan (Figure 130-6), shall be as specified below:
i. Tax Parcel Nos. 271442007, 271442008 and 271451012
Front (Main Street) 38¢ or existing footprint for Emmanuel Church, 10¢ or existing footprint for Benson Hall
Rear (East Sound
shoreline) the lessor of 15¢ from the top-of-bank (measured from the +8¢ OHWM) or the existing footprint
Left (east) 5¢ or existing footprint, subject to the presence of an existing structure (currently occupied by San Juan Insurance Center). Upon removal of this structure, this setback shall become effective and not blocked in the future by new or expanded construction
Right (west) 10¢
ii. Tax Parcel No. 271451010
Front (Main Street) 5¢
Rear (East Sound
shoreline) 5¢ from the top-of-bank (measured from the seaward face of the existing riprap bulkhead) for structures. Decks may project to the landward edge of the riprap line
Left (east) 5¢
Right (west) 5¢
iii. Tax Parcel No. 271451012
Front (Main Street) 5¢ or existing footprint
Rear (East Sound
shoreline) 5¢ from the OHWM for structures. Decks may project to any bulkhead line
Left (east) 5¢
Right (west) 5¢
iv. Tax Parcel No. 271451013
Front (Main Street) 16¢ or existing footprint
Rear (East Sound
shoreline) the lessor of 15¢ from the top-of-bank (measured from the +8¢ OHWM) or the existing footprint for buildings and decks, as shown on Figure 130-6
Left (east) 5¢
Right (west) 5¢
v. Tax Parcel No. 271460050
Front (Main Street) 29¢ or existing footprint except canopy over gas pumps
Rear (East Sound
shoreline) the lessor of 15¢ from the top-of-bank (measured from the +8¢ OHWM) or the existing footprint
Left (east) 5¢ a larger width to replace any visual access lost due to permitted construction between this parcel and TPN 271442010
Right (west) 5¢ or existing footprint, subject to the provision that the Darvill and Porter Station Buildings may be connected together in such a manner that does not substantially impair the visual access corridor, as provided for in Section 16(2)(c)(3) of this MOA
vi. Tax Parcel No. 271442010
Front (Main Street) 22¢ or existing footprint
Rear (East Sound
shoreline) the lessor of 15¢ from the top-of-bank (measured from the +8¢ OHWM) or the existing footprint
Left (east) 5¢ or existing footprint, subject to the provision that the Darvill and Porter Station Buildings may be connected together in such a manner that does not substantially impair the visual access corridor, as provided for in Section 16(2)(c)(3) of this MOA
Right (west) 5¢ or existing footprint
vii. Tax Parcel No. 271442009
Front (Main Street) 9¢ or existing footprint
Rear (East Sound
shoreline) the lessor of 15¢ from the top-of-bank (measured from the +8¢ OHWM) or the existing footprint
Left (east) 5¢ or existing footprint
Right (west) 5¢ or existing footprint, subject to the presence of existing structures (currently occupied by San Juan Insurance Center and service facilities for the bungalow). Upon removal of this structure, this setback shall become effective and not blocked in the future by new or expended construction
The actual setbacks and resulting "building envelope" for each parcel are shown on Figure 130-6.
e. Land use and shoreline permits for the Eastsound urban district may also be subject to easements and agreement with San Juan County.
3. Outdoor Storage. Any outdoor storage shall be screened from view from public roads and from the shoreline by fencing, vegetation or other means. Any such screen shall be at least five feet high.
4. Utilities. Utilities installed to serve new development shall be underground.
5. Open Space and Lot Coverage. The following minimum standards for open space (area not occupied by buildings, parking or driveways) and lot coverage (area covered by buildings) shall be met in all new development:
a. Open space shall be maintained in its natural condition or landscaped; applications for permits required by this plan or the Shoreline Master Program shall specify open space and identify existing or proposed landscape features.
b. Lot coverage by buildings larger than 5,000 square feet in gross floor area shall not exceed 65 percent of the site area.
c. Open space shall be provided in all new and expanded developments and shall be visible from public streets. At least 10 percent of the site area, exclusive of any street front pedestrian easement, shall be open space.
d. Required open space shall be provided in a manner consistent with SJCC 16.55.300(F), Landscaping.
6. Landscaping. Screening shall be required between residential and nonresidential developments. Parking areas shall be landscaped in accordance with standards in SJCC 16.55.300(B)(6), and other landscaping required in this section shall comply with standards in SJCC 16.55.300(F). (Ord. 14-2000 § 7(UU); Ord. 13-2000; Ord. 4-1996; Ord. 12-1994 Att. A; Ord. 62-1992 § 2)
16.55.215 Service park district.
Note: See also SJCC 16.55.300, General development standards, for permit, landscaping, parking, architectural design, signs, lighting, etc., requirements.
A. Purpose.
1. To provide for a service center at the eastern edge of Eastsound, in a relatively small area characterized by an existing mix of service and residential uses, but which is large enough to allow for reasonable growth.
2. To allow for development that preserves the existing character, natural features and visual qualities of adjacent properties by imposing specific development standards, including building height, setbacks, open space, and landscaping.
3. To allow a mixture of commercial service uses and accessory residential units while protecting adjoining residential areas from undesirable commercial and industrial uses which typically generate noise, traffic, or evening activities incompatible with residential neighborhoods.
4. To prohibit new residential development other than residential units accessory to a commercial or industrial use and located within a commercial or industrial building.
B. Allowable and Prohibited Uses. Land uses not specifically listed in this subsection as either allowable or prohibited may be allowed subject to conditional use permit approval. Allowable uses are subject to the required permits and use limitations and the site development and performance standards stated in this section.
The following uses are allowable in the service park district:
Commercial:
1. Automotive services and repair
2. Day care and nursery facilities
3. Equipment rental services
4. Landscaping, nurseries and retail plant sales
5. Offices (business, personal and professional service)
6. Recreational facilities (for profit)
7. Transient lodging of five rooms or less
8. Processing of County-grown agricultural and aquacultural products and associated retail sales which are subordinate to the food processing activity
9. Animal hospitals, animal shelters, and veterinary clinics; provided such use is wholly enclosed within a building or no outdoor storage is permitted unless enclosed by sight-obscuring fencing and vegetation
10. Mini-storage facilities
11. Construction related businesses including but not limited to plumbing, electrical, roofing, siding, etc.; provided such use is wholly enclosed within a building or no outdoor storage is permitted unless enclosed by sight- obscuring fencing and vegetation
Recreational:
1. Indoor and outdoor recreational facilities and parks
2. Community club or community organization facility
Residential:
1. One apartment unit accessory to an allowable commercial or industrial use
2. Home occupation
Transportation:
1. Parking, on-site to serve allowable uses, and driveways
2. Streets, public and private
Utilities:
1. Water, power, cable TV, telephone, and sewer distribution lines
2. Water, power, cable TV, and telephone maintenance, operations, and support facilities
3. Utility service offices and storage buildings
The following uses are prohibited in the service park district:
Commercial/Industrial:
1. Theaters
2. Wrecking and salvage yards
3. Concrete and batch plants
4. Industrial development
5. Equipment wrecking and salvage yards
6. Sand, gravel and other extraction industries
7. Garbage and solid waste transfer stations
8. Slaughterhouses
Recreational:
1. Camping facilities
C. Residential Density. Residential density is limited to not more than one dwelling unit accessory to an allowable commercial or industrial use.
D. Minimum Parcel Size. Minimum parcel or lot size is 0.5 acres.
E. Required Permits and Use Limitations.
1. Site plan review is required for allowable uses if total use area (the gross area of buildings, outdoor storage and other area including required parking area devoted to the proposed use and any accessory residential use) is 4,000 to 10,000 square feet and conditional use permit approval is required if total use area exceeds 10,000 square feet. However, if the administrator determines that a proposed use which would otherwise be allowed outright would likely produce significant air, water or noise pollution or otherwise constitute a nuisance, site plan review shall be required.
2. Construction of or improvements to streets and pedestrian paths shall be subject to site plan review requirements. (Parking spaces, driveways and paths required for an allowable use shall not require a permit separate from any permit required for the use served; provided, that a road access permit must be granted for construction of any driveway entering a public road.)
3. New developments (other than new accessory residential structures) with primary access from the Mount Baker Road Bypass and Terrill Beach Road shall be required to obtain or provide for shared access with at least one adjoining parcel by establishing common driveway easements and/or locating access at property lines. No use permitted in this district shall be designed in a manner that would result in traffic backing onto a public or private street or road right-of-way.
4. New residential development is prohibited except as an accessory to a commercial or industrial use and located within a commercial or industrial building.
F. Performance and Site Development Standards for the Service Park District.
1. Building Height. No building shall exceed 32 feet measured from average grade to the highest point of the highest roof structure.
2. Building Setbacks.
a. No structure shall be built within 30 feet of the property line(s) abutting public rights-of-way.
b. Structures shall be set back from other property lines by at least 10 feet. Architectural appendages (i.e., roof overhangs, chimneys, bay windows, and decks not over 30 inches above grade) may extend two feet into required yards.
3. Outdoor storage. All outdoor storage and the storage of recreational vehicles associated with a dwelling unit shall be screened from view from adjoining properties and from the shoreline, and public roadways by fencing evergreen vegetation or other means. Any such screening shall be at least five feet high. Any outdoor storage associated with any nonresidential use allowed in this district shall also be so screened before any occupancy permit is issued.
4. Utilities. Utilities installed to serve new development shall be underground.
5. Open Space and Lot Coverage. The following maximum lot coverage (area covered by structures) and minimum open space (area not occupied by buildings, parking or driveways) standards shall be met in all new development:
a. Open space shall be maintained in its natural condition or landscaped; applications for permits required by this plan shall specify open space and identify existing or proposed landscape features. Minimum required open space shall be 40 percent.
b. Maximum lot coverage by buildings shall be 25 percent.
c. Open space shall be provided in all new and expanded developments and shall be visible from public streets. At least 40 percent of the site area, exclusive of any street-front pedestrian easement, shall be open space.
d. Required open space shall be provided in a manner consistent with SJCC 16.55.300(F), Landscaping.
6. Landscaping. New development shall be designed to conserve natural site features to the extent possible. Landscaped buffers shall be required along public street frontage in all new development, and screening shall be required between existing residential uses and new nonresidential developments. In addition to the landscaping requirements listed in SJCC 16.55.300(F), a landscaping strip with a minimum width of 10 feet shall be provided along the entire primary road frontage of the site. The landscaping strip shall include evergreen trees.
7. Ground Vibration. No approved use shall generate around vibration perceptible without instruments at any point along or outside of the property line of the site of the use, except for motor vehicle operations.
8. Noise, Glare, and Flashing Lights. Any use, which is allowable under a conditional use permit, on a lot adjacent to or across the street from a residential dwelling (except nonconforming residences), a lot in a platted subdivision, or a residential designation in the subarea plan shall not emit continuous and/or uninterrupted noise, glare, flashing lights, or similar disturbances perceptible without instruments more than 200 feet in the direction of the affected residential use or lot.
9. Air Emissions. No approved use shall generate or cause any visible smoke, gasses, dust, steam, heat or odor to be emitted into the atmosphere, except as necessary for the heating or cooling of buildings, and the operation of motor vehicles on the site. (Ord. 13-2000; Ord. 4-1996)
16.55.220 Village residential district.
Note: See also SJCC 16.55.300, General development standards, for permit, landscaping, parking, architectural design, signs, lighting, etc., requirements.
A. Purpose.
1. To provide area adjoining the village for a mix of single and multiple-family residential uses of moderately high density;
2. To provide for low-intensity commercial uses which are or can be made compatible with residential uses;
3. To provide for civic and cultural facilities that serve the greater island community and which are therefore best located near the village, but which are not desirable within the village itself because of the amount of land required (such as public schools) or because they do not contribute directly to the vitality of the village;
4. To provide for the above uses in a manner which will protect the natural environment and preserve the existing character and informal quality of the Eastsound area by allowing a mix of land uses and by setting standards for landscaping and site and building design; and
5. To preserve natural features significant to the form and character of Eastsound by conserving specific areas for open spaces.
B. Allowable and Prohibited Uses. Land uses not specifically listed in this subsection as either allowable or prohibited may be allowed subject to conditional use permit approval. Allowable uses are subject to the required permits and use limitations and site development and performance standards stated in this section.
The following uses are allowable in the village residential district:
Commercial:
1. Adult day care
2. Day nursery
3. Offices
4. Transient lodging as provided for under SJCC 16.55.220(D)(5)
Institutional:
1. Community club or community organization facility
2. Cultural facility
3. Religious assembly facility
4. School, primary, secondary and college/technical/adult education
Recreational:
1. Park without camping facilities
2. Recreational facilities, indoor
Residential:
1. Single-family dwelling units
2. Multifamily dwelling units
3. Group housing
4. Home occupation
5. Home day care
Transportation:
1. Hangars for noncommercial aircraft storage within the Grassylvania subdivision or when accessory to a single-family residence on land adjacent to the airport use district
2. Off-site parking serving uses in the village commercial district adjacent to the village commercial district boundary, on-site parking and driveways
3. Streets, public and private
Utilities:
1. Water, power, cable TV, telephone and sewer distribution lines
2. Utility storage buildings 400 square feet or smaller
The following uses are prohibited in the village residential district:
Commercial/Industrial:
1. Airport and airport-related use
2. Automotive service
3. Equipment rental service
4. Laundry/laundromat
5. Manufacturing
6. Restaurant
7. Retail
8. Theaters, commercial
Institutional:
1. Library
2. Museum
3. Post office
Recreational:
1. Park with camping facilities
Utilities:
1. Sewage and water treatment facilities
2. Utility service offices
3. Utility storage buildings larger than 400 square feet
C. Residential Density. Minimum and maximum allowable residential densities are as specified on the official map, as amended.
D. Required Permits and Use Limitations.
1. Single-family dwelling units and multifamily developments of two to eight units shall be allowed outright. Developments of nine to 20 multifamily units shall be subject to site plan review. Multifamily developments of more than 20 units shall be subject to conditional use permit approval. These review standards shall apply regardless of phased construction over time.
2. Home occupations, adult family homes and in-home day care facilities which exceed standards for these uses set out in SJCC 18.60.180 and which are allowable uses in accordance with subsection (B) of this section shall be permitted in accordance with applicable permit requirements of this subsection.
3. Professional and personal service and business offices with less than 2,000 square feet of use area shall be subject to site plan review; offices with use area 2,000 square feet or larger shall be subject to approval of a conditional use permit.
4. Construction of or improvements to streets, pedestrian paths and off-site parking areas shall be subject to site plan review requirements. (Parking spaces, driveways and paths required for an allowable use shall not require a permit separate from any permit required for the use served; provided, that a road access permit must be granted for construction of any driveway entering a public road.)
5. Transient lodging with up to six guest rooms, located within the principal residence of the operator, with food service limited to breakfast served to overnight guests only, shall be subject to site plan approval. Other transient lodging shall be subject to conditional use permit approval.
6. New commercial, institutional, recreational and multifamily residential developments with primary access from the Mount Baker Road Bypass shall be required, wherever possible, to obtain or provide for shared access with at least one adjoining parcel by establishing common driveway easements and/or locating access at property lines.
E. Site Development and Performance Standards.
1. Building Height. No building shall exceed 32 feet as measured from average grade to the highest point of the highest roof structure (excluding church spires if area at the base is not larger than five percent of building floor area).
2. Building Setbacks. No building shall be built closer than 40 feet to the centerline of a public or private right-of-way.
3. Side and Rear Yards. Each side yard shall be at least five feet in width and aggregate width shall be at least 12 feet. Rear yards shall be at least 20 feet except that one-story garages and storage sheds may be located not less than three feet from rear property lines. Architectural appendages (i.e., roof overhangs, chimneys, bay windows, and decks not over 30 inches above grade) may extend two feet into required yards.
4. Outdoor Storage. Outdoor storage of recreational vehicles associated with residential use shall be screened from view from adjoining properties and from the shoreline by fencing, vegetation or other means. Other outdoor storage shall be screened from public roads and from the shoreline. Any such screen shall be at least five feet high. Any outdoor storage associated with any nonresidential use allowed in this district shall also be so screened before any occupancy permit is issued.
5. Utilities. Utilities installed to serve new development shall be underground.
6. Open Space and Lot Coverage. The following standards for open space (area not occupied by buildings, parking and driveways) and lot coverage (area covered by buildings) shall be met in all new development:
a. Open space shall be maintained in its natural condition or landscaped; applications for permits required by this plan or the Shoreline Master Program shall specify open space and identify existing or proposed landscape features. Minimum required open space is 30 percent of the total site area.
b. Maximum lot coverage by buildings shall be 30 percent of the total site area.
7. Landscaping. New development shall be designed to conserve natural site features to the extent possible. Landscaped buffers shall be required along public street frontage in all new development except single-family dwelling units, and screening shall be required between residential and nonresidential developments.
8. Lot Size. The minimum size of any parcel created after adoption of the ordinance codified in this chapter shall be 7,000 square feet, except that a smaller parcel size may be created subject to approval of a clustered development plan in accordance with the Land Division Ordinance (Chapter 18.70 SJCC) in which the average density is in compliance with subsection (C) of this section.
9. Mobile Homes. Mobile homes shall have skirting or permanent decks installed to obscure chassis prior to occupancy.
10. Parking. Parking serving commercial uses shall be beside or behind buildings. Residential parking shall not be located within the required street front building setback area, and when parking is located in front of the building it shall be screened from the street. Parking and driveways shall be at least three feet from the side and rear property lines except when shared with the adjoining property. Driveway width at the property line shall not exceed 20 feet.
11. Required Clustering. All residential developments of 20 or more units or any residential development on a parcel or parcels in common ownership of 10 acres or more shall be required to be designed as a cluster of buildings and appurtenances. A minimum of 30 percent of the site shall be retained in open space. All cluster development shall be connected to public water and sewer systems. All projects developed in accordance with these requirements shall be exempt for the conditional use permit requirements of subsection (D)(1) of this section, and will be processed under the site plan review procedures, unless other requirements of the Land Division Ordinance, Chapter 18.70 SJCC, also apply. (Ord. 13-2000; Ord. 4-1996; Ord. 12-1994 Att. A; Ord. 62-1992 § 2)
16.55.230 Service and light industrial district.
Note: See also SJCC 16.55.300, General development standards, for permit, landscaping, parking, architectural design, signs, lighting, etc., requirements.
A. Purpose.
1. To accommodate commercial services and light industrial or construction related activities as well as accessory office and retail uses which are an integral and necessary part of those uses. Such uses are not appropriate within the village commercial district but are necessary and important components of the local economy.
2. To accommodate the existing airport-related facilities and services which are located outside of the airport use district.
3. To provide the land area needed specifically for the above uses within the area currently served by central sewer and water services.
4. To concentrate the above uses around the Eastsound airport where they have already been established.
5. To concentrate the above uses in a manner that will enable efficient use of the transportation system.
6. To prohibit new residential development other than residential units accessory to a commercial or industrial use and located within a commercial or industrial building.
B. Allowable and Prohibited Uses. Land uses not specifically listed in this subsection as either allowable or prohibited may be allowed subject to conditional use permit approval. Allowable uses are subject to the required permits and use limitations and performance and site development standards stated in this section.
The following uses are allowable in the service and light industrial district:
Commercial/Industrial:
1. Airport related uses; provided, that aircraft hangars are only allowable on property adjacent to the existing airport (as of September 1, 1994) or properties which have deeded access rights or through the fence agreements for access to the existing airport
2. Automotive services, including but not limited to auto repair, sales, rentals, parts and supplies, tire stores, and gasoline service stations
3. Construction related businesses including but not limited to plumbing, electrical, roofing, siding, etc.; provided such use is wholly enclosed within a building or no outdoor storage is permitted unless enclosed by sight- obscuring fencing and vegetation.
4. Equipment rental
5. Home occupations
6. Light industrial
7. Laundry/laundromat
8. Office accessory to another allowable use
9. Retail with substantial storage space or incidental to another allowable use
10. Warehouse, mini-storage, and moving storage facilities
11. Manufacturing; provided such use is wholly enclosed within a building or no outdoor storage is permitted unless enclosed by sight-obscuring fencing and vegetation
12. Animal hospitals, animal shelters, and veterinary clinics; provided such use is wholly enclosed within a building or no outdoor storage is permitted unless enclosed by sight-obscuring fencing and vegetation
13. Wholesale distribution outlet
Institutional:
1. Technical or trade schools
Residential:
1. One residential unit accessory to an allowable commercial or industrial use per lot
2. Home day care in single-family units accessory to another allowable use or within a legal nonc