Upon a
showing to the department that construction has been completed in
compliance with the terms of any permit issued under the
provisions of this chapter, it shall be the duty of the
department to issue to the permittee a certificate of groundwater
right stating that the appropriation has been perfected under
such permit: PROVIDED, HOWEVER, That such showing shall include
the following information: (1) the location of each well or
other means of withdrawal constructed under the permit, both with
respect to official land surveys and in terms of distance and
direction to any preexisting well or wells or works constructed
under an earlier permit or approved declaration of a vested
right, provided the distance to such pre-existing well or works
is not more than a quarter of a mile; (2) the depth and diameter
of each well or the depth and general specifications of any other
works constructed under the terms of the permit; (3) the
thickness in feet and the physical character of each bed,
stratum, or formation penetrated by each well; (4) the length and
position, in feet below the land surface, and the commercial
specifications of all casing, also of each screen or perforated
zone in the casing of each well constructed; (5) the tested
capacity of each well in gallons a minute, as determined by
measuring the discharge of the pump or pumps after continuous
operation for at least four hours or, in the case of a flowing
well, by measuring the natural flow at the land surface; (6) for
each nonflowing well, the depth to the static groundwater level
as measured in feet below the land surface immediately before the
well-capacity test herein provided, also the draw-down of the
water level, in feet, at the end of said well-capacity test; (7)
for each flowing well, the shut-in pressure measured in feet
above the land surface or in pounds per square inch at the land
surface; and (8) such additional factual information as
reasonably may be required by the department to establish
compliance with the terms of the permit and with the provisions
of this chapter.
The well driller or other constructor of works for the
withdrawal of public groundwaters shall be obligated to furnish
the permittee a certified record of the factual information
necessary to show compliance with the provisions of this section.
[1987 c 109 § 111; 1945 c 263 § 8; Rem. Supp. 1945 § 7400-8.]
NOTES:
Purpose -- Short title -- Construction -- Rules -- Severability -- Captions -- 1987 c 109: See notes following RCW 43.21B.001.