The provisions of this chapter apply to the construction of
energy facilities which includes the new construction of energy
facilities and the reconstruction or enlargement of existing
energy facilities where the net increase in physical capacity or
dimensions resulting from such reconstruction or enlargement
meets or exceeds those capacities or dimensions set forth in RCW 80.50.020 (7) and (15). No construction of such energy
facilities may be undertaken, except as otherwise provided in
this chapter, after July 15, 1977, without first obtaining
certification in the manner provided in this chapter.
(2) The provisions of this chapter apply to the
construction, reconstruction, or enlargement of a new or existing
energy facility that exclusively uses alternative energy
resources and chooses to receive certification under this
chapter, regardless of the generating capacity of the project.
(3)(a) The provisions of this chapter apply to the
construction, reconstruction, or modification of electrical
transmission facilities when:
(i) The facilities are located in a national interest
electric transmission corridor as specified in RCW 80.50.045;
(ii) An applicant chooses to receive certification under
this chapter, and the facilities are: (A) Of a nominal voltage
of at least one hundred fifteen thousand volts and are located in
a completely new corridor, except for the terminus of the new
facility or interconnection of the new facility with the existing
grid, and the corridor is not otherwise used for electrical
transmission facilities; and (B) located in more than one
jurisdiction that has promulgated land use plans or zoning
ordinances; or
(iii) An applicant chooses to receive certification under
this chapter, and the facilities are: (A) Of a nominal voltage
in excess of one hundred fifteen thousand volts; and (B) located
outside an electrical transmission corridor identified in (a)(i)
and (ii) of this subsection (3).
(b) For the purposes of this subsection, "modify" means a
significant change to an electrical transmission facility and
does not include the following: (i) Minor improvements such as
the replacement of existing transmission line facilities or
supporting structures with equivalent facilities or structures;
(ii) the relocation of existing electrical transmission line
facilities; (iii) the conversion of existing overhead lines to
underground; or (iv) the placing of new or additional conductors,
supporting structures, insulators, or their accessories on or
replacement of supporting structures already built.
(4) The provisions of this chapter shall not apply to normal
maintenance and repairs which do not increase the capacity or
dimensions beyond those set forth in RCW 80.50.020 (7) and (15).
(5) Applications for certification of energy facilities made
prior to July 15, 1977, shall continue to be governed by the
applicable provisions of law in effect on the day immediately
preceding July 15, 1977, with the exceptions of RCW 80.50.190 and 80.50.071 which shall apply to such prior applications and to
site certifications prospectively from July 15, 1977.
(6) Applications for certification shall be upon forms
prescribed by the council and shall be supported by such
information and technical studies as the council may require.
[2007 c 325 § 2; 2006 c 196 § 4; 2001 c 214 § 2; 1977 ex.s. c 371 § 5; 1975-'76 2nd ex.s. c 108 § 34; 1970 ex.s. c 45 § 6.]
NOTES:
Severability -- Effective date -- 2001 c 214: See notes following RCW 80.50.010.
Findings -- 2001 c 214: See note following RCW 39.35.010.
Severability -- Effective date -- 1975-'76 2nd ex.s. c 108: See notes following RCW 43.21F.010.