RCW 74.32.150
Investigation to determine if additional requirements or standards affecting vendor group -- Scope of investigation.

The additional requirements and standards referred to in RCW 74.32.140 shall include but shall not be limited to changes in minimum wage or overtime provisions, changes in building code or facility requirements for occupancy or licensing, and changes in requirements for staffing, available equipment, or methods and procedures.

[1971 ex.s. c 298 § 2.]