(1) Except as provided in
subsection (2) of this section, no power boiler, low pressure
boiler, or unfired pressure vessel which does not conform to the
rules and regulations formulated by the board governing new
construction and installation shall be installed and operated in
this state after twelve months from the date upon which the first
rules and regulations under this chapter pertaining to new
construction and installation shall have become effective, unless
the boiler or unfired pressure vessel is of special design or
construction, and is not covered by the rules and regulations,
nor is in any way inconsistent with such rules and regulations,
in which case an inspection certificate may at its discretion be
granted by the board.
(2) An inspection certificate may also be granted for
boilers and pressure vessels manufactured before 1951 which do
not comply with the code requirements of the American Society of
Mechanical Engineers adopted under this chapter, if the boiler or
pressure vessel is operated exclusively for the purposes of
public exhibition, and the board finds, upon inspection, that
operation of the boiler or pressure vessel for such purposes is
not unsafe.
[2009 c 90 § 1; 1984 c 93 § 1; 1951 c 32 § 6.]