Prenotification to the department under RCW 49.26.120 shall not be
required for:
(1)(a) Any asbestos project involving less than forty-eight
square feet of surface area, or less than ten linear feet of pipe
unless the surface area of the pipe is greater than forty-eight
square feet. The person undertaking such a project shall keep the
reports, or statements, and written descriptions required under RCW 49.26.013 and 49.26.120 which shall be available upon request of
the department. Employees and employee representatives may request
such reports under RCW 49.26.013(2).
(b) The director may waive the prenotification requirement
upon written request of an owner for large-scale, on-going
projects. In granting such a waiver, the director shall require
the owner to provide prenotification if significant changes in
personnel, methodologies, equipment, work site, or work procedures
occur or are likely to occur. The director shall further require
annual resubmittal of such notification.
(c) The director, upon review of an owner's reports, work
practices, or other data available as a result of inspections,
audits, or other authorized activities, may reduce the size
threshold for prenotification required by this section. Such a
change shall be based on the director's determination that
significant problems in personnel, methodologies, equipment, work
site, or work procedures are creating the potential for violations
of this chapter or asbestos requirements under chapter 49.17 RCW. The new prenotification requirements shall be given in writing to
the owner and shall remain in effect until modified or withdrawn in
writing by the director.
(2) Emergency projects.
(a) As used in this section, "emergency project" means a
project that was not planned and results from a sudden, unexpected
event, and does not include operations that are necessitated by
nonroutine failure of equipment or systems.
(b) Emergency projects which disturb or release any material
containing asbestos into the air shall be reported to the
department within three working days after the commencement of the
project in the manner otherwise required under this chapter. A
notice shall be clearly posted adjacent to the work site describing
the nature of the emergency project. The employees' collective
bargaining representatives, or employee representatives, or
designated representatives, if any, shall be notified of the
emergency as soon as possible by the person undertaking the
emergency project.
Incremental phasing in the conduct or design of asbestos
projects or otherwise designing or conducting asbestos projects of
a size less than forty-eight square feet, or other threshold for
exemption as provided under this section, with the intent of
avoiding prenotification requirements is a violation of this
chapter.
[1989 c 154 § 8. Prior: 1988 c 271 § 13.]
NOTES:
Purpose -- Severability -- 1989 c 154: See notes following RCW 49.26.013.