In developing the state route
number 520 project impact plan provided in RCW 47.01.405, the
mediator and associated planning staff shall review the
department's project design plans in the draft environmental
impact statement for conformance with the following legislative
goals regarding the final design for the state route number 520
bridge replacement and HOV project:
(1) Minimize the total footprint and width of the bridge,
and seek appropriate federal design variances to safety and
mobility standards, while complying with other federal laws;
(2) Minimize the project impact on surrounding
neighborhoods, including incorporation of green lids and
connectors, and minimize any increases in additional traffic
volumes through the Washington park arboretum and other adjacent
neighborhoods;
(3) Incorporate the recommendations of a health impact
assessment to calculate the project's impact on air quality,
carbon emissions, and other public health issues, conducted by
the Puget Sound clean air agency and King county public health;
(4) Ensure that the ultimate project configuration
effectively prioritizes maintaining travel time, speed, and
reliability on the two high occupancy vehicle lanes; and
(5) Clearly articulate in required environmental documents
the alignment of the selected preferred alternative for the state
route number 520 bridge replacement and HOV project and the
footprint of the project and the affected areas.
[2007 c 517 § 3.]
NOTES:
Finding -- Severability -- Effective date -- 2007 c 517: See notes following RCW 47.01.405.