The following waste discharge permit
actions are not subject to the requirements of RCW 43.21C.030(2)(c):
(1) For existing discharges, the issuance, reissuance, or
modification of a waste discharge permit that contains conditions
no less stringent than federal effluent limitations and state
rules;
(2) The issuance of a construction storm water general
permit under chapter 90.48 RCW for a proposal disturbing less
than five acres. The exemption in this subsection does not apply
if, under rules adopted by the department of ecology, the
proposal would otherwise be subject to the requirements of RCW 43.21C.030(2)(c).
[2008 c 37 § 2; 1996 c 322 § 1.]
NOTES:
Intent -- 2008 c 37: "The legislature intends that the revised threshold adopted in 2005 for the department of ecology's construction storm water general permit should not increase the scope of projects subject to state environmental policy act review. The department of ecology should pursue rule making to achieve the intent of this act." [2008 c 37 § 1.]