Chapter 3.104
FEES AND CHARGES
Sections:
3.104.010 Fees and charges.
3.104.010 Fees and charges.
The fees and charges set forth in Table 3.104.010 are established as city of Lynnwood fees and charges for the 2009 – 2010 biennium.
|
Type of Fee |
Details |
09 – 10 Amount |
|
Title 1: General Provisions |
||
|
Notice of decision |
mailing notice to each person who has requested such notice in writing for the calendar year |
110.00 |
|
Notice of hearing |
mailing notice to each person who has requested such notice in writing for the calendar year |
110.00 |
|
Fee for filing an appeal |
per appeal |
38.50 |
|
Public notice of impending decision |
mailing notice to each person who has requested such notice in writing for the calendar year |
110.00 |
|
Process on appeal |
38.50 |
|
|
Notice of hearing |
mailing notice to each person who has requested such notice in writing for the calendar year |
110.00 |
|
Title 2: Administration and Personnel |
||
|
Streets and public works department |
||
|
Appeal of interpretation of public works director |
100.00 |
|
|
Title 3: Finance |
||
|
Transportation Impact Fee – Miscellaneous Fees |
||
|
Independent fee calculation review |
cost per calculation |
250.00 |
|
Administrative fee |
The greater of 100.00 or 3% of the TrIFs payable under this chapter and not to exceed 3,000.00 |
|
|
Appeal fee: filing of an appeal of code interpretation or acceptable alternates with the hearing examiner |
filing fee plus cost of hearing |
286.50 |
|
ITE Land Use (Code) |
Unit |
Fee Per Unit Eff. January 1, 2011 |
Fee Per Unit Eff. January 1, 2013 |
||
|
Zone A – City Center and Mall (Fee Rate per Peak Hour Trip = $4,086.00) |
Zone B – Remainder of the City (Fee Rate per Peak Hour Trip = $6,310.00) |
Zone A – City Center and Mall (Fee Rate per Peak Hour Trip = $5,107.00) |
Zone B – Remainder of the City (Fee Rate per Peak Hour Trip = $7,887.00) |
||
|
Single-family (detached) dwelling (210) |
dwelling |
4,126.86 |
6,373.10 |
5,158.07 |
7,965.87 |
|
Duplex (detached) dwelling (210) |
dwelling |
4,126.86 |
6,373.10 |
5,158.07 |
7,965.87 |
|
Multifamily – 3 or more bedrooms (231) |
dwelling |
3,187.08 |
4,921.80 |
3,983.46 |
6,151.86 |
|
Multifamily – under 3 bedrooms (blend 220, 221, 230) |
dwelling |
2,451.60 |
3,786.00 |
3,064.20 |
4,732.20 |
|
Mobile home park (240) |
dwelling |
2,288.16 |
3,533.60 |
2,859.92 |
4,416.72 |
|
Self-contained retirement community (251) |
dwelling |
1,062.36 |
1,640.60 |
1,327.82 |
2,050.62 |
|
Senior adult housing – attached (252) |
dwelling |
449.46 |
694.10 |
561.77 |
867.57 |
|
Office building – single building (blend 710, 714, 715) |
sq. ft. |
6.13 |
9.47 |
7.66 |
11.83 |
|
Office park – multiple buildings (750) |
sq. ft. |
6.13 |
9.47 |
7.66 |
11.83 |
|
Business park – multiple buildings (770) |
sq. ft. |
5.27 |
8.14 |
6.59 |
10.17 |
|
Research and development center (760) |
sq. ft. |
4.41 |
6.81 |
5.52 |
8.52 |
|
Manufacturing (140) |
sq. ft. |
3.02 |
4.67 |
3.78 |
5.84 |
|
Industrial park (130) |
sq. ft. |
3.51 |
5.43 |
4.39 |
6.78 |
|
General light industrial (110) |
sq. ft. |
4.00 |
6.18 |
5.01 |
7.73 |
|
General heavy industrial (120) |
sq. ft. |
2.78 |
4.29 |
3.47 |
5.36 |
|
Warehousing – industrial (150) |
sq. ft. |
1.92 |
2.97 |
2.40 |
3.71 |
|
Self-service storage (151) |
sq. ft. |
1.06 |
1.64 |
1.33 |
2.05 |
|
High-cube warehouse (152) |
sq. ft. |
0.41 |
0.63 |
0.51 |
0.79 |
|
Truck terminal (30) |
acres |
26,763.30 |
41,330.50 |
33,450.85 |
51,659.85 |
|
Church (560) |
sq. ft. |
1.63 |
2.52 |
2.04 |
3.15 |
|
School – high (530) |
sq. ft. |
3.75 |
5.79 |
4.69 |
7.24 |
|
School – elementary and middle (520) |
sq. ft. |
0.65 |
1.01 |
0.82 |
1.26 |
|
Nursing home (620) |
beds |
809.03 |
1,249.38 |
1,011.19 |
1,561.63 |
|
Congregate care facility, elderly housing (253) |
living unit |
625.16 |
965.43 |
781.37 |
1,206.71 |
|
Auto parts sales (843) |
sq. ft. |
12.22 |
18.87 |
15.27 |
23.58 |
|
Auto care center – multiple stores (942) |
sq. ft. |
11.05 |
17.06 |
13.81 |
21.33 |
|
Car sales – new and used (841) |
sq. ft. |
10.30 |
15.90 |
12.87 |
19.88 |
|
Tire store (848, 849) |
v.s.p. |
6,782.76 |
10,474.60 |
8,477.62 |
13,092.42 |
|
Service station – no minimart (944) |
v.s.p. |
11,898.43 |
18,374.72 |
14,871.58 |
22,966.94 |
|
Service station – with minimart (945) |
v.s.p. |
10,934.14 |
16,885.56 |
13,666.33 |
21,105.61 |
|
Quick-lube vehicle servicing (941) |
v.s.p. |
10,603.17 |
16,374.45 |
13,252.67 |
20,466.77 |
|
Carwash (947) |
v.s.p. |
11,318.22 |
17,478.70 |
14,146.39 |
21,846.99 |
|
Drinking place – pub, tavern, bar (936) |
sq. ft. |
37.07 |
57.24 |
46.33 |
71.55 |
|
Restaurant – fast food (934) |
sq. ft. |
28.31 |
43.72 |
35.38 |
54.64 |
|
Restaurant – quality (931) |
sq. ft. |
24.48 |
37.81 |
30.60 |
47.26 |
|
Restaurant – sit down (932) |
sq. ft. |
22.31 |
34.45 |
27.88 |
43.06 |
|
Lodge, fraternal organization, with dining facilities (591) |
sq. ft. |
22.06 |
34.07 |
27.58 |
42.59 |
|
Library (590) |
sq. ft. |
26.07 |
40.26 |
32.59 |
50.33 |
|
Health/fitness club (492) |
sq. ft. |
14.89 |
23.00 |
18.62 |
28.75 |
|
Bowling alley (437) |
sq. ft. |
13.02 |
20.10 |
16.27 |
25.13 |
|
Recreational community center (495) |
sq. ft. |
6.03 |
9.31 |
7.54 |
11.64 |
|
Racquet/tennis club (491) |
sq. ft. |
3.09 |
4.77 |
3.86 |
5.96 |
|
Bank – walk-in (911) |
sq. ft. |
47.41 |
73.21 |
59.25 |
91.51 |
|
Bank – drive-in (912) |
sq. ft. |
46.72 |
72.15 |
58.40 |
90.19 |
|
Convenience market (851 – 853) |
sq. ft. |
30.65 |
47.33 |
38.30 |
59.15 |
|
Hardware/paint store (816) |
sq. ft. |
14.83 |
22.91 |
18.54 |
28.63 |
|
Shopping center, under 65,000 sq. ft. (820) |
sq. ft. |
9.81 |
15.14 |
12.26 |
18.93 |
|
Building materials and lumber store (812) |
sq. ft. |
14.68 |
22.67 |
18.34 |
28.33 |
|
Apparel store (870) |
sq. ft. |
12.52 |
19.33 |
15.65 |
24.17 |
|
Video rental store (896) |
sq. ft. |
25.01 |
38.62 |
31.25 |
48.27 |
|
Supermarket – discount (850, 854) |
sq. ft. |
24.72 |
38.18 |
30.90 |
47.72 |
|
Pharmacy/drug store (880, 881) |
sq. ft. |
24.37 |
37.63 |
30.46 |
47.04 |
|
Specialty retail center – strip mall (814) |
sq. ft. |
8.86 |
13.68 |
11.07 |
17.10 |
|
Discount club – membership warehouse store (861) |
sq. ft. |
13.86 |
21.40 |
17.32 |
26.75 |
|
Electronics superstore (863) |
sq. ft. |
12.87 |
19.88 |
16.09 |
24.84 |
|
Freestanding discount store (815) |
sq. ft. |
14.47 |
22.35 |
18.09 |
27.94 |
|
Toy/children’s superstore (864) |
sq. ft. |
14.27 |
22.04 |
17.84 |
27.55 |
|
Freestanding discount superstore (813) |
sq. ft. |
12.65 |
19.54 |
15.81 |
24.42 |
|
Home improvement superstore (862) |
sq. ft. |
9.01 |
13.91 |
11.26 |
17.39 |
|
Factory outlet center (823) |
sq. ft. |
8.42 |
13.00 |
10.53 |
16.26 |
|
Furniture store (890) |
sq. ft. |
1.69 |
2.61 |
2.11 |
3.27 |
|
Nursery – garden center (817) |
acres |
27,654.05 |
42,706.08 |
34,564.18 |
53,379.22 |
|
Nursery – wholesale (818) |
acres |
1,949.02 |
3,009.87 |
2,436.04 |
3,762.10 |
|
State motor vehicles/licensing agency (731) |
sq. ft. |
48.88 |
75.49 |
61.10 |
94.35 |
|
U.S. Post Office (732) |
sq. ft. |
17.80 |
27.49 |
22.25 |
34.36 |
|
Medical/dental office or clinic (630, 720) |
sq. ft. |
13.46 |
20.79 |
16.82 |
25.98 |
|
Hospital (610) |
sq. ft. |
4.34 |
6.70 |
5.42 |
8.38 |
|
Day care (565) |
sq. ft. |
10.77 |
16.63 |
13.46 |
20.79 |
|
Hotel/motel – no convention facilities (310 – 312, 320) |
room |
1,949.02 |
3,009.87 |
2,436.04 |
3,762.10 |
|
Note 1: The fees effective on January 1, 2011, will increase by 20% on January 1, 2013, per LMC 3.105.210, Phasing of fees. The fees effective on January 1, 2013, will become effective January 1, 2013 per LMC 3.105.210(B). |
|||||
|
Note 2: The fees effective on January 1, 2011, will be further adjusted on January 1, 2013, per LMC 3.105.150, Periodic adjustment of fees. The fees effective on January 1, 2013, will be adjusted on January 1, 2013, per LMC 3.105.150, Periodic adjustment of fees. |
|||||
|
Note 3: If a development activity is located within the city center – core (CC-C), city center – west (CC-W), and city center – north (CC-N) districts as defined in Chapter 21.60 LMC, then the trip generation (as determined by the ITE Trip Generation Manual) can be reduced 15% for said development activity. |
|||||
|
Type of Fee |
Details |
09 – 10 Amount |
|
Title 5: Business Regulations and License Fees |
||
|
Resident, nonresident and home occupation 5.06.040 |
||
|
First time business license (resident and home occupation business) |
one-time fee |
115.50 |
|
Home occupation |
per year |
28.50 |
|
Nonresident business |
per year |
157.00 |
|
Resident business |
per year |
97.50 |
|
Each employee of resident business |
per year |
15.50 |
|
Special fee assessed 5.06.050 |
||
|
Liquor license – In addition to resident business |
max. person load capacity |
1.00 |
|
Garbage collection 5.08.020 |
||
|
Garbage collection |
for each resident |
3.00 |
|
for each commercial account |
100.00 |
|
|
Pawnbroker 5.16.025 |
||
|
Pawnbroker business |
per year |
265.00 |
|
Per pawnbroker employee |
per year |
53.00 |
|
Peddlers and salesmen 5.20.030 |
||
|
Investigation fee |
one time |
40.00 |
|
Special license – Daily fee |
per day |
16.00 |
|
Peddlers |
per year |
64.00 |
|
Public dances 5.25.020 |
||
|
Public dance license – Noncabaret |
per year |
200.00 |
|
One dance only |
per dance – no more than three in 30 days |
20.00 |
|
Teen public dance 5.26.020 |
||
|
Teen dance license |
per year |
200.00 |
|
One dance only |
per dance – no more than three in 30 days |
20.00 |
|
Special events 5.30.040 |
||
|
Temporary special event permit fee |
initial permit fee |
160.00 |
|
Repeating event under same application |
repeating |
53.00 |
|
Parade permit 5.32.020 |
||
|
Permit fee |
per parade (maximum two parades a year) |
160.00 |
|
Repeating event under same application |
repeating |
53.00 |
|
Circuses and carnivals permit 5.34.020 |
||
|
Permit fee |
initial permit fee |
160.00 |
|
Repeating event under same application |
repeating |
53.00 |
|
Submittal of late application |
50% surcharge |
|
|
Security deposit |
for vacation and site left clean and neat |
|
|
Taxicabs and for-hire vehicles 5.40.050 |
||
|
For-hire vehicle business |
per year – per company |
165.00 |
|
For-hire vehicle driver’s license fee |
initial license |
45.00 |
|
For-hire vehicle driver’s license fee – Renewal |
per year |
35.00 |
|
Investigation fee 5.40.070 |
required with initial license |
40.00 |
|
Emergency care, first aid and ambulance services 5.45.020 |
||
|
Registration fee |
annual |
26.50 |
|
CATV system |
||
|
Application fee 5.48.030 |
initial |
200.00 |
|
Franchise fee 5.48.050 |
5% of gross receipts from prior calendar quarter |
|
|
Escort bureaus, services and escorts 5.49.070 |
||
|
Escort bureau or introductory service |
per year – nonrefundable |
530.00 |
|
Escort or escort bureau runner |
per year – nonrefundable |
106.00 |
|
Escort bureau or intro service manager |
per year – nonrefundable |
106.00 |
|
Adult entertainment 5.50.050 |
||
|
Adult entertainment premises license |
per year |
2,650.00 |
|
Adult entertainer’s license |
per year |
265.00 |
|
Adult entertainment manager |
per year |
1,060.00 |
|
Public bathhouses 5.51.040 |
||
|
License fee |
per year |
45.00 |
|
Worker |
each |
15.50 |
|
Investigation fee – Nonrefundable |
initially |
40.00 |
|
Private security guards and companies, private detectives and agencies 5.54.020 |
||
|
Nonresident business |
per year |
157.00 |
|
Resident business |
per year |
97.50 |
|
Additional per employee |
per year |
15.50 |
|
Day spas 5.55.040 |
||
|
Body scrub facility |
initial application |
45.00 |
|
Applicant and employees overseeing body scrubs investigation fee |
per year |
40.00 |
|
Renewal fee for applicant and employees overseeing scrubs |
per year |
40.00 |
|
Amusement centers 5.60.020 |
||
|
Amusement center |
per year |
320.00 |
|
Operator’s fee 5.60.050 |
per year |
215.00 |
|
Amusement device – Over $0.10 to operate/more than $0.10 per hour |
per year |
50.00 |
|
Amusement device – $0.10 or less |
per year |
25.00 |
|
Master license – One who leases or rents amusement devices to others 5.60.085 |
per year |
320.00 |
|
Panorams, previews, picture arcades, peep shows 5.62.050 |
||
|
Panoram premises license |
per annum |
530.00 |
|
Panoram device license |
per annum for each device |
53.00 |
|
Panoram manager’s license |
per annum |
26.50 |
|
Master license fee – Required if no premises license |
per year |
320.00 |
|
Vending machines 5.63.040 |
||
|
Operator’s license |
per year |
105.00 |
|
Vending machine license – Not tobacco |
per year |
5.50 |
|
Vending machine license – Tobacco |
per year |
27.00 |
|
Cabarets and taverns 5.66.030 |
||
|
Resident business |
per year |
97.50 |
|
Each employee of resident business |
per year |
15.50 |
|
Certain business 5.70.030 |
||
|
Bowling alley – Same as resident |
per year |
97.50 |
|
Each employee – Resident |
per year |
15.50 |
|
Hotel |
per year |
25.00 |
|
Each room |
per year |
0.60 |
|
Theater and show |
per seat – per year not to exceed $200.00 |
0.20 |
|
Skating or roller rink |
per year |
106.00 |
|
Open air Christmas tree lots |
two months |
26.50 |
|
Flea market 5.70.030 |
||
|
Special license – Daily fee |
per day |
10.00 |
|
Special license – Weekend |
Saturday and Sunday |
16.00 |
|
Flea market participants |
per year |
40.00 |
|
Auctions and auctioneers 5.81.020 |
||
|
Business premises |
per day |
26.50 |
|
Including dates of auction |
January – December before first event |
212.00 |
|
Auctioneer – Home occupation |
per year |
28.50 |
|
Nonresident |
per year |
157.00 |
|
Resident |
per year |
97.50 |
|
Resident – Employees |
per employee per year |
15.50 |
|
Secondhand dealers 5.82.020 |
||
|
Dealers |
per year |
265.00 |
|
Bond required |
annually |
1,000.00 |
|
Employees 5.82.025 |
per year |
53.00 |
|
Title 6: Animal Fees |
||
|
Animal fees |
||
|
Spayed or neutered cats and dogs |
lifetime tag |
5.50 |
|
Unspayed or unneutered cats and dogs |
annual – January 1st to December 31st |
53.00 |
|
Replacement tags (lost) |
|
3.00 |
|
Dangerous animal |
||
|
Annual registration fee |
100.00 |
|
|
Type of Fee |
Details |
09 – 10 Amount |
|
Impound and boarding fees |
||
|
Impound fees – Domestic animals |
53.00 |
|
|
Boarding fees – Domestic animals |
per day |
13.00 |
|
Impound fees – Livestock |
100.00 |
|
|
Boarding fees – Livestock |
per day |
Vendor Rate |
|
Impound fees – Other animals |
80.00 |
|
|
Boarding fees – Other animals |
per day |
Vendor Rate |
|
Title 9: Fire Permits |
||
|
Fire |
||
|
Plan check fee |
per hour with 1/2 hr. minimum |
110.00 |
|
Compressed gases – Original |
121.00 |
|
|
Renewal fee |
per year |
60.00 |
|
Cryogens – Original |
121.00 |
|
|
Renewal fee |
per year |
60.00 |
|
Dust-producing operations – Original |
121.00 |
|
|
Renewal fee |
per year |
60.00 |
|
Hazardous materials – Original |
241.00 |
|
|
Renewal fee |
per year |
121.00 |
|
Hazardous production materials – Original |
240.00 |
|
|
Renewal fee |
per year |
121.00 |
|
Spraying or dipping – Original |
121.00 |
|
|
Renewal fee |
per year |
60.00 |
|
Sprinkler plan review/inspection fee |
231.00 |
|
|
per sprinkler head over 10 |
2.30 |
|
|
Fire alarm per plan review/inspection fee |
231.00 |
|
|
per device over 10 detectors |
2.30 |
|
|
Commercial kitchen hood |
231.00 |
|
|
NFPA 13-D sprinkler system |
116.00 |
|
|
International Fire Code permits |
173.00 |
|
|
Land use review fee |
116.00 |
|
|
Underground oil tank removal |
116.00 |
|
|
Fire alarm control replacement |
116.00 |
|
|
Fire alarm transmitter replacement |
116.00 |
|
|
Fire alarm power panel replacement |
110.00 |
|
|
Expedited permit fee |
219.00 |
|
|
Reinspection fee (after three visits) |
110.00 |
|
|
Preventable alarm fee (after three alarms) |
58.00 |
|
|
Tent permit |
per tent or canopy |
104.00 |
|
Fireworks |
||
|
Retail sales outlet |
per year |
100.00 |
|
Appeals |
||
|
Filing of an appeal of code interpretation or acceptable alternates with the hearing examiner |
filing fee plus cost of hearing |
286.50 |
|
Transport fees |
||
|
Basic life support |
475.00 |
|
|
Advanced life support – Level 1 |
700.00 |
|
|
Advanced life support – Level 2 |
800.00 |
|
|
Mileage |
per mile |
15.50 |
|
Title 12: Streets and Sidewalks |
||
|
Right-of-way use permit |
||
|
Underground work |
first 100 lineal feet plus $195.00 for each additional 100 lineal feet of disturbance up to 500 lineal feet plus $43.00 for each 100 lineal feet thereafter |
610.00 |
|
Above ground work, new installations |
first 100 lineal feet plus $43.00 for each 100 lineal feet thereafter |
610.00 |
|
Above ground work, repair or replacement (including work from manhole to manhole in existing conduit)* |
first 100 lineal feet plus $43.00 for each 100 lineal feet thereafter |
205.00 |
|
*For utility relocation work resulting from city-requested projects, the above fees are waived. Waiver of fees does not apply if utility proposes any upgrades or new facilities with relocation. |
||
|
Road improvement permit |
first 300 lineal feet of road plus $390.00 for each additional 100 lineal feet of road or fraction thereof |
1,410.00 |
|
Right-of-way vacation |
||
|
Prehearing fee |
nonrefundable payment |
500.00 |
|
Title 13: Water |
||
|
Hydrant use permit (water consumption additional) |
minimum charge |
410.00 |
|
deposit |
400.00 |
|
|
Metered water through hydrants |
||
|
100 cubic feet |
5.15 |
|
|
1,000-gallon tank |
5.90 |
|
|
Nonmetered water consumption through hydrant |
minimum charge |
380.00 |
|
Water meter installed by city forces (includes facilities charge) |
||
|
3/4" meter |
3,260.00 |
|
|
1" meter |
4,040.00 |
|
|
1-1/2" meter (short, less than 25') |
5,075.00 |
|
|
1-1/2" meter (long) |
6,885.00 |
|
|
2" meter (short, less than 25') |
5,480.00 |
|
|
2" meter (long) |
7,275.00 |
|
|
Meters when services are installed by a developer (includes facilities charge) |
||
|
2" or less |
85% of the above fee |
|
|
3/4" meter |
2,770.00 |
|
|
1" meter |
3,430.00 |
|
|
1-1/2" meter (short, less than 25') |
4,310.00 |
|
|
1-1/2" meter (long) |
5,850.00 |
|
|
2" meter (short, less than 25') |
4,660.00 |
|
|
2" meter (long) |
6,185.00 |
|
|
Over 2" (always installed by the developer) |
cost of meter and appurtenances plus $1,836.00 |
|
|
Water main/service permit |
first 100 lineal feet plus $390.00 for each additional 100 lineal feet or fraction thereof |
610.00 |
|
Purity tests |
minimum one test |
205.00 |
|
There shall be a minimum fee of $205.00 for each purity test administered; provided, that one test of purity on any main extension will be made without charge so long as the test can be made in coordination with a routine group of purity tests. |
||
|
Cross-connection control permit (outside the building envelope) |
||
|
Over the counter plan review |
100.00 |
|
|
Commercial or residential |
610.00 |
|
|
Storm drainage permit |
||
|
Residential permit roof or foundation drain installation (greater than 50 feet) |
410.00 |
|
|
Residential permit roof or foundation drain installation (50 feet or less or connected to existing within 50 feet) |
150.00 |
|
|
Retention/detention system |
1,225.00 |
|
|
Conveyance system (pipe, ditch, swale, etc.) |
first 100 lineal feet plus $390.00 for each additional 100 lineal feet or fraction thereof |
610.00 |
|
Private water service permit |
||
|
New water service (each) – Commercial, SFR, plat or short plat |
305.00 |
|
|
Repair or replacement of water lines between the meter and building (greater than 25 feet) |
150.00 |
|
|
Repair or replacement of water lines between the meter and building (25 feet or less) |
80.00 |
|
|
Water main connection permit |
1,225.00 |
|
|
Fire hydrant inspection permit |
410.00 |
|
|
Reinspection fee |
75.00 |
|
|
Work concealed without inspection or work not ready at time of inspection will be charged a reinspection fee. |
||
|
Title 14: Sewers |
||
|
New side sewer (each) – Commercial, SFR, plat or short plat |
610.00 |
|
|
Side sewer installation – Repair or replacement (greater than 25 feet) |
290.00 |
|
|
Side sewer installation – Repair or replacement (25 feet or less) |
150.00 |
|
|
Sewer main installation permit |
first 100 lineal feet plus $390.00 for each additional 100 lineal feet or fraction thereof |
610.00 |
|
Sewer main connection permit |
1,230.00 |
|
|
Sewer capping permit (including abandonment of on-site septic system) |
75.00 |
|
|
Private sewer system permit |
610.00 |
|
|
Industrial waste limited discharge permit |
305.00 |
|
|
Industrial waste discharge permit |
first application |
6,050.00 |
|
all subsequent applications |
2,040.00 |
|
|
Grease interceptor permit |
305.00 |
|
|
Sewer lateral permit |
first 100 lineal feet plus $390.00 for each additional 100 lineal feet or fraction thereof |
610.00 |
|
Reinspection fee |
75.00 |
|
|
Work concealed without inspection or work not ready at time of inspection will be charged a reinspection fee. |
||
|
Title 15: Plumbing and Mechanical Fees for One- and Two-Family Dwellings |
||
|
Plumbing fees (one- and two-family dwellings) |
||
|
Permit issuance |
||
|
Issuing each permit |
36.00 |
|
|
Supplemental permit |
18.00 |
|
|
Unit fee schedule |
||
|
Each plumbing fixture |
18.00 |
|
|
Each floor sink |
18.00 |
|
|
Each floor drain |
18.00 |
|
|
Rainwater systems – Per drain (inside building) |
18.00 |
|
|
Each water heater |
18.00 |
|
|
Installation, alteration or repair of water piping and/or water-treating equipment |
18.00 |
|
|
Repair or alteration of drainage vent piping |
18.00 |
|
|
Lawn sprinkler system on any one meter, including backflow protection devices |
18.00 |
|
|
Backflow protection devices on individual fixtures |
One to three |
18.00 |
|
Four or more each |
3.60 |
|
|
For all other backflow protection devices |
30.00 |
|
|
Mechanical permit fees |
||
|
Permit issuance |
||
|
Issuance of each permit, including separate issuance of combination permits |
36.00 |
|
|
Issuing each supplemental permit |
18.00 |
|
|
Unit fee schedule |
||
|
Installation of each furnace, heater, or burner, including ducts and vents attached thereto, up to and including 100,000 BTUs |
24.00 |
|
|
Installation of each furnace, heater, or burner, including ducts and vents attached thereto, over 100,000 BTUs |
36.00 |
|
|
Installation, relocation or replacement of each appliance vent installed and not included in an appliance permit |
18.00 |
|
|
For repair, alteration or addition to each piece of heating and cooling equipment including controls |
24.00 |
|
|
Installation or relocation of each boiler or |
up to 3 hp/100,000 BTUs |
30.00 |
|
over 3 hp to 15 hp/100,000 to 500,000 BTUs |
48.00 |
|
|
over 15 hp to 30 hp/500,000 to 1,000,000 BTUs |
66.00 |
|
|
over 30 hp to 50 hp/1,000,000 to 1,750,000 BTUs |
84.00 |
|
|
over 50 hp/over 1,750,000 BTUs |
102.00 |
|
|
For each air-handler not part of a system including ducts: |
10,000 cubic feet per minute or less |
18.00 |
|
over 10,000 cubic feet per minute |
30.00 |
|
|
Ventilation fan connected to a single duct |
12.00 |
|
|
Ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit |
24.00 |
|
|
Installation of each Type I hood which is served by mechanical exhaust, including the ducts for such hood |
30.00 |
|
|
Installation or relocation of each domestic-type incinerator |
30.00 |
|
|
Installation or relocation of each commercial or industrial-type incinerator |
90.00 |
|
|
For each appliance and equipment regulated by the IRC or IMC for which no other fee is listed in this fee schedule (i.e., fireplaces, wood stoves, miscellaneous nonportable appliances) |
24.00 |
|
|
When Chapter 13 is applicable, permit fees for fuel-gas piping shall be as follows: |
||
|
For gas piping as a single outlet or as a system: |
one to four outlets |
24.00 |
|
over four outlets each |
6.00 |
|
|
Other inspections and fees – Rates per hour |
||
|
Inspections outside of normal business hours |
minimum charge two hours on weekdays or four hours on weekends |
110.00 |
|
Title 16: Building and Commercial Plumbing/Mechanical Fees |
||
|
Building permits |
||
|
Total valuation |
||
|
$0 – $1,000 |
53.00 |
|
|
$1,001 – $2,000 |
first $1,000 plus |
53.00 |
|
for each additional $100.00 or fraction thereof, to and including $2,000 |
4.00 |
|
|
$2,001 – $25,000 |
first $2,000 plus |
93.00 |
|
for each additional $1,000 or fraction thereof, to and including $25,000 |
17.00 |
|
|
$25,001 – $50,000 |
first $25,000 plus |
484.00 |
|
for each additional $1,000 or fraction thereof, to and including $50,000 |
12.00 |
|
|
$50,001 – $100,000 |
first $50,000 plus |
784.00 |
|
for each additional $1,000 or fraction thereof, to and including $100,000 |
8.00 |
|
|
$100,001 – $500,000 |
first $100,000 plus |
1,184.00 |
|
for each additional $1,000 or fraction thereof, to and including $500,000 |
7.00 |
|
|
$500,001 – $1,000,000 |
first $500,000 plus |
3,984.00 |
|
for each additional $1,000 or fraction thereof, to and including $1,000,000 |
6.00 |
|
|
$1,000,001 – $5,000,000 |
first $1,000,000 plus |
6,984.00 |
|
for each additional $1,000 or fraction thereof |
4.00 |
|
|
$5,000,001 and up |
first $5,000,000 plus |
22,984.00 |
|
for each additional $1,000 or fraction thereof |
3.00 |
|
|
Other inspections and fees – Rates per hour |
||
|
Plan review fees on all building permits requiring review unless listed below |
65% of building permit fee |
|
|
Plan review fees on commercial plumbing and mechanical permits requiring review |
40% of plumbing and/or mechanical permit fees |
|
|
Inspections outside of normal business hours |
minimum charge two hours on weekdays or four hours on weekends* |
110.00 |
|
Processing fee on all permits not requiring plan review |
36.00 |
|
|
Reinspection fee |
($55.00 for 1/2 hour + $36.00 processing fee) |
91.00 |
|
Inspections for which no fee is specifically indicated |
minimum charge 1/2 hour |
110.00 |
|
Additional plan review required by changes, additions or revisions to approved plans (minimum charge 1/2 hour)* |
hourly charge |
110.00 |
|
Investigative fee on stop work orders |
an amount equal to the permit fee |
|
|
Demolition permit for removal or destruction of existing buildings |
removal of primary building |
180.00 |
|
removal of accessory building/structure |
90.00 |
|
|
Minimum housing or license care inspection |
162.00 |
|
|
*Or the total hourly cost incurred by the city, whichever is greatest. The actual cost shall include wages, benefits, overhead, supervision, supplies and equipment of the employees involved. |
||
|
House moving permit |
733.00 |
|
|
House move into Lynnwood pre-inspection |
162.00 |
|
|
Change of occupancy requiring an inspection |
162.00 |
|
|
Inspection fee on stop work orders |
an amount equal to the permit fee |
|
|
Grading permit |
application fee |
425.00 |
|
Grading plan review fees |
||
|
50 cubic yards (38.2 m3) or less |
No Fee |
|
|
51 to 100 cubic yards (40 m3 to 76.5 m3) |
28.00 |
|
|
101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) |
45.00 |
|
|
1,001 to 10,000 cubic yards (765.3 m3 to 7,645.5 m3) |
59.00 |
|
|
10,001 to 100,000 cubic yards (7,646 m3 to 76,455 m3) |
first 10,000 cubic yards (7,645.5 m3) plus |
59.00 |
|
each additional 10,000 cubic yards (7,645.5 m3) |
30.00 |
|
|
100,001 to 200,000 cubic yards (76,456 m3 to 152,911 m3) |
first 100,000 cubic yards (76,455 m3) plus |
325.00 |
|
each additional 10,000 cubic yards (7,645.5 m3) |
16.00 |
|
|
200,001 cubic yards (152,912 m3) or more |
first 200,000 cubic yards (152,911 m3) plus |
484.00 |
|
each additional 10,000 cubic yards (7,645.5 m3) |
9.00 |
|
|
Grading permit fees |
||
|
50 cubic yards (38.2 m3) or less |
28.00 |
|
|
51 to 100 cubic yards (40 m3 to 76.5 m3) |
45.00 |
|
|
101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) |
first 100 cubic yards (76.5 m3) plus |
45.00 |
|
each additional 100 cubic yards (76.5 m3) |
21.00 |
|
|
1,001 to 10,000 cubic yards (765.3 m3 to 7,645.5 m3) |
first 1,000 cubic yards (764.6 m3) plus |
234.00 |
|
each additional 1,000 cubic yards (764.6 m3) |
18.00 |
|
|
10,001 to 100,000 cubic yards (7,646 m3 to 76,455 m3) |
first 1,000 cubic yards (7,645.5 m3) plus |
391.00 |
|
each additional 10,000 cubic yards (7,645.5 m3) |
79.00 |
|
|
100,001 cubic yards (76,456 m3) or more |
first 100,000 cubic yards (76,455 m3) plus |
1,106.00 |
|
each additional 10,000 cubic yards (7,645.5 m3) |
44.00 |
|
|
Appeals |
||
|
Filing of an appeal of code interpretation or acceptable alternates with the hearing examiner |
filing fee plus cost of hearing |
301.00 |
|
Electrical permit fees (2218, 2143) |
||
|
Plan review fees |
40% of the electrical permit fee or minimum |
36.00 |
|
Processing fee on permits not requiring plan review |
36.00 |
|
|
Additional plan review required by changes, additions or revisions to approved plans (minimum charges – 1/2 hour) |
$110.00 an hour, minimum 1/2-hour charge |
110.00 |
|
Plan review done outside normal business hours |
$110.00 an hour, minimum 1/2-hour charge |
110.00 |
|
Inspections outside normal business hours (extension of hours minimum 2 hours, call back minimum 4 hours) |
110.00 |
|
|
Inspection for which no specific fee is listed (1/2-hour minimum charge) |
110.00 |
|
|
Electrical permit fees |
||
|
Commercial and multifamily (includes low voltage) |
||
|
Up to $1,000 |
90.00 |
|
|
$1,001 to $5,000 |
base plus |
90.00 |
|
1.72% of the cost over $1,000 |
||
|
$5,001 to $20,000 |
base plus |
158.80 |
|
1.43% of the cost over $5,000 |
||
|
$20,001 to $50,000 |
base plus |
373.30 |
|
1.14% of the cost over $20,000 |
||
|
$50,001 to $250,000 |
base plus |
715.30 |
|
1.03% of the cost over $50,000 |
||
|
$250,001 to $1,000,000 |
base plus |
2,775.30 |
|
0.86% of the cost over $250,000 |
||
|
$1,000,001 and above |
base plus |
9,225.30 |
|
0.57% of the cost over $1,000,000 |
||
|
New Single Family |
||
|
New single family dwelling up to 200 AMP includes garage |
Add $36.00 processing fee |
162.00 |
|
New single family over 200 AMP |
Add $36.00 processing fee |
231.00 |
|
Garages, pools, spas and outbuildings |
96.00 |
|
|
Low voltage systems (security, phone, computer, etc.) |
63.00 |
|
|
Single Family Remodel and Service Charge |
||
|
Service/panel change or alteration – no added circuits |
90.00 |
|
|
Service/plan changes or alternation – added/altered circuits |
$90.00 plus $12.00 each added circuit (maximum fee $162.00) |
|
|
Circuits added/altered without service change (up to 10 circuits) |
90.00 |
|
|
Circuits added/altered without service change (more than 10 circuits) |
$90.00 plus $8.00 each added circuit (maximum fee $162.00) |
|
|
Meter/mast repair or alteration |
90.00 |
|
|
Low voltage systems (security, phone, computer, etc.) |
63.00 |
|
|
Miscellaneous |
||
|
Temporary service |
90.00 |
|
|
Manufacturing/mobile home service (does not include garage or outbuildings) |
90.00 |
|
|
Carnivals (including art and street fairs, haunted houses, amusement rides, and similar temporary events) |
base fee |
90.00 |
|
per concession |
12.00 |
|
|
T-Stats commercial |
||
|
T-Stats |
first |
36.00 |
|
each additional T-Stat |
6.00 |
|
|
Installation transfer (switch) panel and residential generator |
49.00 |
|
|
Work concealed without inspection or work not ready at the time of inspection will be charged a reinspection fee |
$55.00 plus $36.00 processing fee |
91.00 |
|
Swimming pools, hot tubs, spas and saunas (applicants must also get a building permit for pool, hot tub or spa) |
96.00 |
|
|
Portable classrooms and mobile home service |
90.00 |
|
|
Sign installations |
||
|
Permit fee for electrical hook-ups required on a sign (applicant must also get a sign permit) |
per sign |
36.00 |
|
Request to inspect existing installation |
90.00 |
|
|
Title 17: Environment Fees |
||
|
Environmental checklist review (SEPA) and threshold determination |
fee |
750.00 |
|
Environmental impact statement (EIS) |
deposit or per contract |
1,000.00 |
|
Public notice requirements |
||
|
Posting costs |
(placing notices on proposed project site) |
110.00 |
|
Mailing costs |
actual postage costs plus staff hourly rate |
|
|
Publication in newspaper |
actual cost |
|
|
City attorney support |
actual cost |
|
|
Hearing examiner |
actual cost |
|
|
Sensitive area permit |
||
|
Application with no mitigation plan as required by Chapter 17.10 LMC |
617.00 |
|
|
Application with a mitigation plan as required by Chapter 17.10 LMC, plus any costs accrued by the city for expert consultants necessary to review such applications |
1,419.00 |
|
|
Tree removal permit |
||
|
Class I tree removal permit |
if site inspection is required by LMC 17.15.110 |
58.00 |
|
Class II tree removal permit |
first 10 significant tree units approved for removal |
174.00 |
|
each additional significant tree unit |
6.75 |
|
|
Class II nonsignificant trees |
58.00 |
|
|
Class I tree replacement option fee |
67.00 |
|
|
Class II tree replacement option fee |
168.00 |
|
|
Class II unreplaceable tree fee |
per tree |
95.00 |
|
Title 18: Planning Fees |
||
|
Application for plan amendment |
||
|
Suggested amendment |
fee |
57.00 |
|
Application for text or map change amendment |
deposit to trust account to cover hourly processing charges and posting and mailing costs |
3,000.00 |
|
Project design review (PDR) |
deposit to trust account to cover hourly processing charges and posting and mailing costs |
2,500.00 |
|
Request for formal code interpretation |
263.00 |
|
|
Administrative amendment to previously approved project/permit |
263.00 |
|
|
Miscellaneous plan review not associated with a permit (e.g., parking lot) |
158.00 |
|
|
Title 19: Subdivision Fees |
||
|
Plat review (subdivision five lots or more) |
deposit to trust account to cover hourly processing charges and posting and mailing costs |
3,000.00 |
|
Short subdivision (four lots or less) |
1,500.00 |
|
|
Binding site plan |
1,500.00 |
|
|
Public notice requirements |
||
|
Posting costs |
(placing notices on proposed project site) |
110.00 |
|
Mailing costs |
actual postage costs plus staff hourly rate |
|
|
Publication in newspaper |
actual cost |
|
|
City attorney support |
actual cost |
|
|
Hearing examiner |
actual cost |
|
|
Title 21: Zoning Fees |
||
|
Project design review (PDR) |
deposit to trust account to cover hourly processing charges and posting and mailing costs |
2,500.00 |
|
Request for formal code interpretation |
250.00 |
|
|
Administrative amendment to previously approved project/permit |
250.00 |
|
|
Miscellaneous plan review not associated with a permit (e.g., parking lot) |
150.00 |
|
|
Public notice requirements |
||
|
Posting costs |
(placing notices on proposed project site) |
110.00 |
|
Mailing costs |
actual postage costs plus staff hourly rate |
|
|
Publication in newspaper |
actual cost |
|
|
City attorney support |
actual cost |
|
|
Hearing examiner |
actual cost |
|
|
Interpretation of zoning code |
time of filing/per request |
110.00 |
|
Signs with searchlights |
per permit |
28.00 |
|
Mailing of notices to each person requesting notices |
per calendar year |
275.00 |
|
Public and semi-public zone |
||
|
Transition or buffer strips (greenbelts) request for reduction |
per request |
220.00 |
|
Commercial zones |
||
|
Transition or buffer strips (greenbelts) request for reduction |
per request |
220.00 |
|
Planned regional shopping center zone |
||
|
Transition or buffer strips (greenbelts) request for reduction |
per request |
220.00 |
|
Reclassification (rezone) |
deposit to trust account to cover hourly processing charges and posting and mailing costs |
3,000.00 |
|
Reclassification (rezone) public agency |
fee |
550.00 |
|
Conditional use permits |
deposit to trust account to cover hourly processing charges and posting and mailing costs |
1,500.00 |
|
Variances |
||
|
Single-family |
fee |
572.00 |
|
Standard |
deposit to trust account to cover hourly processing charges and posting and mailing costs |
1,500.00 |
|
Planned unit development (PUD) |
deposit to trust account to cover hourly processing charges and posting and mailing costs |
3,000.00 |
|
Accessory dwelling unit |
deposit to trust account to cover hourly processing charges and posting and mailing costs |
1,000.00 |
|
Wireless communication facility |
deposit to trust account to cover hourly processing charges and posting and mailing costs |
1,000.00 |
|
Public notice of impending decision |
mailing notice to each person who has requested such notice in writing for the calendar year |
110.00 |
|
Miscellaneous Fees |
||
|
Final utility bill calculation request |
per request |
35.00 |
|
WebCheck for final bill – Online |
per request |
30.00 |
|
Annexation |
||
|
Application fee |
||
|
plus |
posting and mailing costs |
|
|
plus |
any estimated expenses for consultants |
|
|
Boundary line adjustment |
deposit to trust account to cover hourly processing charges and posting and mailing costs |
1,500.00 |
|
Color or black and white maps, standard |
(a reproduction of an existing map product with no changes) |
|
|
Per square foot |
2.00 |
|
|
27" x 33" map |
12.00 |
|
|
Color or black and white maps, custom |
(new map or custom modification of an existing, including reductions or enlargements) |
hourly |
|
Per square foot* |
3.30 |
|
|
*(increased rate to cover cost of “check plots” to ensure correctness of map before final printing) |
||
|
GIS/CADD information |
minimum 1/2 hour |
hourly |
|
Storage media |
actual cost of required storage media |
|
|
Request for information letter |
95.00 |
|
|
Zoning certification letter |
35.00 |
|
|
Weekend work permit |
for the entire time the specific project is in effect |
150.00 |
|
Fingerprinting fees |
for two cards |
10.00 |
|
each additional card |
2.50 |
|
|
Digital photo reproduction fee |
per request |
25.00 |
|
Electronic home monitoring program fee |
daily |
30.00 |
|
Community service fee |
30.00 |
|
|
Jail commitment extension fee |
40.00 |
|
|
Parks and Recreation Department Fees |
||
|
Facility admission fees |
(includes pool, hydrotherapy pool, sauna and weight room) |
|
|
Individual use |
||
|
Under 3 |
resident |
Free |
|
nonresident |
Free |
|
|
Youth (3 – 15) |
resident |
2.00 – 3.50 |
|
nonresident |
2.25 – 4.00 |
|
|
Adult (16 – 61) |
resident |
2.75 – 4.50 |
|
nonresident |
3.00 – 5.00 |
|
|
Senior (62+) |
resident |
2.00 – 3.50 |
|
nonresident |
2.25 – 4.00 |
|
|
Disabled |
resident |
2.00 – 3.50 |
|
nonresident |
2.25 – 4.00 |
|
|
Family |
resident |
7.50 – 9.50 |
|
nonresident |
8.50 – 11.00 |
|
|
Ten-visit punch cards |
||
|
Under 3 |
resident |
N/A |
|
nonresident |
N/A |
|
|
Youth (3 – 15) |
resident |
16.00 – 24.00 |
|
nonresident |
18.50 – 28.00 |
|
|
Adult (16 – 61) |
resident |
24.00 – 34.00 |
|
nonresident |
28.00 – 38.00 |
|
|
Senior (62+) |
resident |
16.00 – 24.00 |
|
nonresident |
18.50 – 28.00 |
|
|
Disabled |
resident |
16.00 – 24.00 |
|
nonresident |
18.50 – 28.00 |
|
|
Three-month passes |
||
|
Under 3 |
resident |
N/A |
|
nonresident |
N/A |
|
|
Youth (3 – 15) |
resident |
65.00 – 75.00 |
|
nonresident |
85.00 – 95.00 |
|
|
Adult (16 – 61) |
resident |
98.00 – 118.00 |
|
nonresident |
118.00 – 128.00 |
|
|
Senior (62+) |
resident |
65.00 – 75.00 |
|
nonresident |
85.00 – 95.00 |
|
|
Disabled |
resident |
65.00 – 75.00 |
|
nonresident |
85.00 – 95.00 |
|
|
Family |
resident |
162.00 – 193.00 |
|
nonresident |
189.00 – 222.00 |
|
|
Open gym |
||
|
Youth (3 – 15) |
resident |
2.00 – 3.00 |
|
nonresident |
2.00 – 3.00 |
|
|
Adult (16 – 61) |
resident |
3.00 – 4.00 |
|
nonresident |
3.00 – 4.00 |
|
|
Senior (62+) |
resident |
2.00 – 3.00 |
|
nonresident |
2.00 – 3.00 |
|
|
Racquetball |
||
|
Drop-in |
resident |
5.50 – 7.50 |
|
nonresident |
6.50 – 8.50 |
|
|
Reserved |
resident |
7.50 – 9.50 |
|
nonresident |
8.50 – 10.50 |
|
|
Silver pass |
resident |
55.00 – 65.00 |
|
nonresident |
65.00 – 75.00 |
|
|
Gold pass |
resident |
75.00 – 85.00 |
|
nonresident |
85.00 – 95.00 |
|
|
Facility rental fees |
||
|
Pool (hourly rate) |
||
|
Up to 100 people |
resident |
84.00 – 105.00 |
|
nonresident |
109.00 – 120.00 |
|
|
101 – 160 people |
resident |
107.00 – 118.00 |
|
nonresident |
121.00 – 138.00 |
|
|
161 – 220 people (summer only) |
resident |
127.00 – 142.00 |
|
nonresident |
137.00 – 152.00 |
|
|
Wading pool |
||
|
Up to 18 people |
resident |
N/A |
|
nonresident |
N/A |
|
|
Room rental |
||
|
Up to 35 people |
resident |
25.00 – 32.00 |
|
nonresident |
32.00 – 41.00 |
|
|
Over 35 people |
resident |
42.00 – 49.00 |
|
nonresident |
50.00 – 59.00 |
|
|
Picnic shelters (permit fee) |
||
|
Groups under 100 (half day) |
resident |
37.00 – 44.00 |
|
nonresident |
57.00 – 66.00 |
|
|
Groups under 100 |
resident |
55.50 – 65.50 |
|
nonresident |
85.50 – 94.50 |
|
|
Groups over 100 (half day) |
resident |
55.00 – 62.00 |
|
nonresident |
89.00 – 98.00 |
|
|
Groups over 100 |
resident |
83.00 – 90.00 |
|
nonresident |
101.00 – 110.00 |
|
|
Heritage Park Plaza |
||
|
Half day |
resident |
50.00 – 60.00 |
|
nonresident |
75.00 – 90.00 |
|
|
Full day |
resident |
75.00 – 90.00 |
|
nonresident |
112.00 – 125.00 |
|
|
Field rentals (per hour) |
||
|
Youth |
field |
10.00 – 15.00 |
|
additional for lights |
10.00 – 15.00 |
|
|
Adult (softball) |
field |
19.00 – 24.00 |
|
additional for lights |
10.00 – 15.00 |
|
|
Adult (football and soccer) |
field |
19.00 – 24.00 |
|
additional for lights |
10.00 – 15.00 |
|
|
Field rentals (Lynnwood High School Field 4 – new turf field) |
||
|
Youth |
27.00 – 33.00 |
|
|
Adult |
39.00 – 47.00 |
|
|
Indoor gym |
||
|
Youth |
18.00 – 24.00 |
|
|
Adult |
30.00 – 38.00 |
|
|
Half indoor gym |
||
|
Youth |
14.00 – 21.00 |
|
|
Adult |
22.00 – 27.00 |
|
|
Golf fees |
($1.00 discount for residents on greens fees) |
|
|
Adults |
||
|
18 holes – Weekdays |
29.00 – 30.00 |
|
|
18 holes – Weekends and holidays |
34.00 – 35.00 |
|
|
9 holes |
18.00 – 19.00 |
|
|
Junior |
||
|
9 holes |
12.00 – 15.00 |
|
|
18 holes |
20.00 – 23.00 |
|
|
Senior |
||
|
9 holes |
16.00 – 17.00 |
|
|
18 holes |
26.00 – 27.00 |
|
|
*Family Golf Hour |
||
|
Adult |
14.00 – 15.00 |
|
|
Junior |
7.00 – 10.00 |
|
|
**Twilight play |
23.00 – 24.00 |
|
|
Tournament |
35.00 – 36.00 |
|
|
Power cart rental |
||
|
18 holes |
rate for two people per cart |
26.00 – 32.00 |
|
9 holes |
rate for two people per cart |
13.00 – 16.50 |
|
Push cart rental |
5.50 – 9.00 |
|
|
Full set rental clubs |
16.50 – 22.00 |
|
|
Half set rental clubs |
11.00 – 16.50 |
|
|
Range balls |
N/A |
|
|
*Family Golf Hour – Last seven tee times of each day May through September – nine holes only – for adult with junior. |
||
|
**Twilight – All tee times after the last scheduled tee time for 18 holes – Play as many holes as light permits. |
||
(Ord. 2850 § 4 (Exhs. B, C), 2010; Ord. 2831 § 4, 2010; Ord. 2785 § 2, 2009; Ord. 2764 §§ 1, 2, 2008; Ord. 2697 §§ 1, 2, 2007)